In the mid-1960's the US Air Force conducted a series of classified studies on next-generation space transportation systems to support projected large military space stations, conduct manned military reconnaissance and strike missions, and reduce the cost of launching military payloads. These Air Force studies finally concluded that a partially reusable vehicle was the most attractive, along the lines of Lockheed's Starlifter, which had a large drop tank but returned the engines and avionics of the vehicle for reuse. The Air Force probably spent around $ 1 billion on 'black' technology development tests at this time, including work on linear aerospike engines and high fineness lifting body shapes that would re-emerge again 30 years later in Lockheed's X-33 space shuttle successor.
NASA also had ambitious plans - for large space stations, lunar bases, nuclear interplanetary rocket stages, and manned Mars expeditions. NASA went through a long iterative process in designing and selecting the space shuttle, leading ultimately to the same conclusion as the Air Force. Initial Phase A concepts were for two stages, both either winged or lifting bodies, both recovered at the launch site for reuse. NASA explored some alternative concepts, including Lockheed's LS200 single orbiter with drop tank, and Chrysler's SERV ballistic single stage to orbit vehicle, before proceeding to Phase B. The Phase B designs were more refined but still used the same two-stage approach. At this point the controversy were over large cross-range winged designs, medium cross-range lifting body designs, and minimal cross-range stub-wing designs. NASA's Faget strongly pushed for the stub-wing design.
Eventually the Nixon administration advised NASA that not only were there to be no flights to Mars, no nuclear interplanetary stages, no space station, no more Saturn V's, no orbital transfer vehicle - but there wouldn't be a space shuttle either if NASA couldn't get the development cost down and get the USAF to participate. A USAF requirement was a large cross-range to allow recovery of the orbiter at Vandenberg AFB from polar orbits in the case of abort-once-around scenarios. This, together with wind tunnel studies indicating that Faget�s straight wing was unstable at re-entry speeds, drove NASA to the delta wing. The reduction in development cost led NASA to throw away the concept of reusing anything but the engines and guidance systems. Instead the shuttle would be boosted by cheap solid fuel boosters and, taking a concept from the Air Force, the propellants would be put in a big expendable drop tank.
Following the usual charade of competitive bidding, NASA picked the same contractors as for X-15 and Apollo, who would build precisely the vehicle it had in mind. North American Rockwell was selected to build the orbiter, with its Rocketdyne Division making the main engines, Thiokol for the solid rocket boosters, and Martin Marietta for the External Tank, to be built at the government Saturn IC factory at Michoud.
To finance the Shuttle in the austere 1970�s, already-built Apollo hardware that would have supported a second Skylab mission was sent to museums and American manned space flight went into a long hiatus. Budget cuts and overruns reduced the number of shuttles built from five to four and delayed the first flight from 1978 to 1981 (thereby ruining the plan to save Skylab on an early shuttle mission). Although several elements were cancelled (a space tug), the project did not much overrun its original cost (development ended up costing $ 6.744 billion in 1971 dollars, versus $ 5.15 billion estimated - less than a quarter of the Apollo program cost).
The pretext for the shuttle was that it would be much cheaper than expendable launch vehicles and would replace them all. Production was accordingly terminated by the US government of Delta, Atlas, and Titan vehicles. NASA staff and contractors were under incredible pressure to justify this decision by increasing the shuttle launch rate, lowering the turn-around time, and thereby reducing the cost per launch. When the shuttle Challenger exploded and the entire US space lift program was shut down for almost a year, the fallacy of this situation was exposed. The US Air Force and commercial users returned to use of expendable launch vehicles. When the shuttle began flying again, it was only for NASA programs.
In the final analysis the shuttle came up short in two areas. First, the shuttle orbiter ended up almost 20% over its specified weight - resulting in it being unable to boost the US Air Force�s payloads into polar orbits from Vandenberg. Lighter filament-would casing Solid Rocket Boosters were being developed for use in flights from Vandenberg, but even this did not seem enough. After the Challenger explosion the USAF was able to extricate itself from the Shuttle program. The Vandenberg launch complex, built at the cost of billions, was mothballed. The Air Force started a new costly development program to design the Titan 4 expendable rocket for its large military payloads.
The second was that it failed, by most definitions, to reduce the cost of putting payloads into orbit. The shuttle program inherited from Apollo huge fixed costs - the Manned Spaceflight Center in Houston, the cadres of government and contractor workers at the Kennedy Space Center, and so on. The result was that there is a fixed base cost of around $ 2.8 billion per year, just to keep all those people and facilities in place, even if you don�t conduct any flights at all (as occurred after the shuttle disaster). The marginal cost of each flight added to this base is under $ 100 million per year. Seen this way the shuttle is almost competitive expendable boosters - but doesn�t come anywhere near the reductions NASA promised when development started. But if you divide the usual number of flights per year by the total costs, you come up with a figure of $ 245 million per year, significantly more than a Titan 4 or Proton launch with the same payload.
If the shuttle failed as a space truck, it succeeded in keeping the US in the manned spaceflight business in a period of low public interest and political support. With the excuse of delivering payloads to orbit, NASA got to fly up to seven astronauts and run a host of supplementary experiments and payloads with each flight.
With construction of the international space station beginning, NASA is looking forward to finally using the shuttle for its intended purpose. Due to the lower than planned flight rate, NASA�s contractors are confident they can keep the existing shuttles flying through 2030. The real test will come when (inevitably) another shuttle is lost. Major Events: .
Rockwell receives authority to proceed, space shuttle orbiter
Start structural assembly crew module, Enterprise (OV-101)
Start long-lead fabrication (MPTA-098)
Start structural assembly aft fuselage, Enterprise (OV-101)
Start long-lead fabrication aft fuselage (STA-099)
Start long-lead fabrication aft fuselage, Columbia (OV-102)
Wings on dock, Palmdale-less elevons, seals and main gear doors-Enterprise (OV-101)
Vertical stabilizer on dock, Palmdale (main fin box only), Enterprise (OV-101)
Start final assembly and closeout system installation, Enterprise (OV-101)
Aft fuselage on dock, Palmdale, Enterprise (OV-101)
Space shuttle main engine first main stage test at NSTL
Lower forward fuselage on dock, Palmdale, Enterprise (OV-101)
Start long-lead fabrication of crew module, Columbia (OV-102)
Upper forward fuselage on dock, Palmdale, Enterprise (OV-101)
1/4-scale model ground vibration test facility construction starts.
Payload bay doors on dock, Palmdale, Enterprise (OV-101)
Complete final assembly and closeout system installation.
Start functional checkout, Enterprise (OV-101).
Complete premate MPTA test structure, Downey, and deliver to Palmdale
Complete assembly and deliver MPTA structure on dock, Lockheed test site, Palmdale
MPTA-098 proof load test setup, Lockheed test site, Palmdale
Complete MPTA-098 proof load test, Lockheed test site and on dock, Palmdale
Start horizontal ground vibration tests and proof load tests, Enterprise (OV-101)
SSME dummy set on dock, Palmdale, Enterprise (OV-101)
Start overland roadway construction from Palmdale to Edwards Air Force Base.
Reaction control system/orbital maneuvering system pods (simulated), approach and landing tests, on dock, Palmdale, Enterprise
Escape system test assembly sled ship from Downey to Holloman, N.M.
Solid rocket booster 1/4-scale model (burnout configuration)
Complete overland roadway construction, Palmdale to Edwards Air Force Base
Boeing 747 shuttle carrier aircraft delivered to Edwards
Complete aft fuselage assembly on dock, Palmdale (STA-099)
Mass simulated SSMEs on dock, Palmdale, Enterprise (OV-101)
Enterprise (OV-101)/shuttle carrier aircraft mate start
Complete Enterprise (OV-101)/shuttle carrier aircraft mated
Conduct first inert captive flight, Edwards (2 hours, 5 minutes), Enterprise (OV-101)
Conduct second inert captive flight, Edwards (3 hours, 13 minutes), Enterprise (OV-101)
Conduct third inert captive flight, Edwards (2 hours, 28 minutes), Enterprise (OV-101)
Conduct fourth inert captive flight, Edwards (2 hours, 11 minutes), Enterprise (OV-101)
Conduct fifth inert captive flight, Edwards (1 hour, 39 minutes), Enterprise (OV-101)
Complete systems installation/final acceptance, MPTA-098, transport from Downey to Seal Beach
Complete integrated checkout and hot-fire ground test, Edwards, Enterprise (OV-101)
First manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (55 minutes, 46 seconds)
Second manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (1 hour, 2 minutes)
Start long-lead fabrication aft fuselage, Discovery (OV-103)
Conduct 2-minute firing of SRB at Brigham City, Utah, Thiokol (2.4 million pounds of thrust)
Deliver forward payload bay doors, on dock, Palmdale (STA-099)
Third manned captive active flight. Enterprise (OV-101)/shuttle carrier aircraft, Edwards (59 minutes, 50 seconds)
Conduct first free flight, ALT, tail cone on, Edwards (5 minutes, 21 seconds), Enterprise (OV-101), lake bed Runway 17
Deliver external tank MPTA-098 (Martin Marietta) to NSTL
Second free flight, ALT, tail cone on, Edwards (5 minutes, 28 seconds), Enterprise (OV-101), lake bed Runway 17
Third free flight , ALT, tail cone on, Edwards (5 minutes, 34 seconds), Enterprise (OV-101), lake bed Runway 15
Complete mate vertical stabilizer, Palmdale (STA-099)
Fourth free flight, ALT, first tail cone off, Edwards (2 minutes, 34 seconds), Enterprise (OV-101), lake bed Runway 17
Fifth free flight, ALT, final tail cone off, Edwards (2 minutes, 1 second), Enterprise (OV-101), concrete Runway 04
Start final assembly and closeout system installation, Palmdale, Columbia (OV-102)
First ferry flight test, Edwards (3 hours, 21 minutes), Enterprise (OV-101)
Second ferry flight test, Edwards (4 hours, 17 minutes), Enterprise (OV-101)
Third ferry flight test, Edwards (4 hours, 13 minutes), Enterprise (OV-101)
Fourth ferry flight test, Edwards (3 hours, 37 minutes), Enterprise (OV-101)
Complete approach and landing flight tests, including ferry flights, Enterprise (OV-101)
Start removal for mated vertical ground vibration test modification at Edwards, Enterprise (OV-101)
Deliver SSME envelope/electrical simulators on dock, Palmdale, Columbia (OV-102)
Complete modification for mated vertical ground vibration test, Edwards, Enterprise (OV-101)
Ferry Enterprise (OV-101) atop shuttle carrier aircraft from Edwards to Ellington Air Force Base, Texas (approximately 3 hours, 38 min)
Ferry Enterprise (OV-101) atop shuttle carrier aircraft from Ellington AFB to Marshall Space Flight Center, Huntsville, Ala.
External tank for mated vertical ground vibration test delivered.
Operational readiness date, solid rocket booster refurbishment and subassembly, Kennedy Space Center. Fla.
Complete ground vibration test modification at MSFC
![]() | Shuttle Orbiter - Shuttle Orbiter 2 view Credit: © Mark Wade. 4,696 bytes. 402 x 425 pixels. |
First static firing, MPTA-098, NSTL (2.5 seconds; stub nozzles)
Complete final assembly and closeout system installation, ready for power-on, Columbia (OV-102)
Forward payload bay doors on dock, Palmdale, Columbia (OV-102)
Start Enterprise (OV-101)/ ET mated vertical ground vibration test, MSFC
Loaded SRBs (2) arrive at MSFC for mated vertical ground vibration test
Third static firing, MPTA-098, NSTL (50 seconds, 90% thrust)
Complete mate forward and aft payload bay doors, Columbia (OV-102)
Reconfigure from boost to launch, mated vertical ground vibration test, MSFC, Enterprise (OV-101)
Deliver SRBs (2) empty to MSFC for mated vertical ground vibration test
Operational readiness date, Orbiter Processing Facility Bay 1, shuttle landing facility, and Hypergolic Maintenance Facility, KSC
Start coefficient tests, STA-099, Lockheed facility, Palmdale
Operational readiness date, Vertical Assembly Building High Bays 3 and 4, KSC
Complete coefficient tests, STA-099, Lockheed facility, Palmdale
Operational readiness date, mobile launcher platform, KSC
Demolition and construction work began at Space Launch Complex 6 in preparation for the Space Shuttle program.
Start long-lead fabrication crew module, Challenger (OV-099)
Start orbiter/ET/SRB burnout mated vertical ground vibration test, MSFC
Mission Control Center-Houston/Goldstone ready for operational flight test early operations.
Complete mated vertical ground vibration test program at MSFC, Enterprise (OV-101)
Operational readiness date, shuttle landing site, Edwards (Edwards AFB) Runway 23, for first manned orbital flight
Columbia (OV-102) transported overland from Palmdale to Edwards (38 miles)
Shuttle carrier aircraft/Columbia (OV-102) test flight at NASA Edwards
Space shuttle main engine 2005, first flight engine delivered to NSTL for acceptance test firings
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Edwards to Biggs Army Air Base, El Paso, Texas (3 hours, 20 minutes)
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Biggs Army Air Base to Kelly AFB, San Antonio, Texas (1 hr, 39 min)
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Kelly AFB to Eglin AFB, Fla. (2 hours, 12 minutes)
Ferry flight, shuttle carrier aircraft/Columbia (OV-102) from Eglin AFB to KSC (1 hour, 33 minutes)
Space shuttle main engine 2007, flight engine delivered to NSTL for acceptance test firing
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101) from MSFC to KSC (1 hour, 52 minutes)
Space shuttle main engine 2006, flight engine delivered to NSTL, for acceptance test firing
Complete left-hand OMS/RCS Phase I qualification, WSTF May 1 Enterprise (OV-101)/ ET/SRBs mated on mobile launcher platform,
Fifth static firing, MPTA-098, NSTL, flight nozzles 1.5 seconds
Deliver right-hand OMS/RCS from McDonnell Douglas, St. Louis, to KSC, Columbia (OV-102)
Deliver left-hand OMS/RCS from McDonnell Douglas to KSC, Columbia (OV-102)
Deliver ET used in mated vertical ground vibration test from MSFC to Martin Marietta for refurbishment
Fifth static firing, MPTA-098, NSTL, flight nozzles (54 seconds, early cutoff, accelerometer filters)
First SRB qualification firing, Thiokol, Utah, 122 seconds; nozzle extension severed at end of run as in actual mission; full cycle gimbal
Sixth static firing, MPTA-098, NSTL, flight nozzles (19 seconds, early cutoff-main fuel valve rupture)
Enterprise (OV-101), ET, SRBs transported on mobile launcher platform from Launch Complex 39-A to Vehicle Assembly Building at KSC
Complete limit test (STA-099), Lockheed facility, Palmdale
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), KSC to Atlanta (1 hour, 55 minutes)
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Atlanta to St. Louis (1 hour, 50 minutes)
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), St. Louis to Tulsa (1 hour, 35 minutes)
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Tulsa to Denver (2 hours)
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Denver to Hill AFB, Ogden, Utah (1 hour, 30 minutes)
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Ogden to Vandenberg AFB (2 hours, 20 minutes)
Ferry flight, shuttle carrier aircraft/Enterprise (OV-101), Vandenberg AFB to Edwards (1 hour, 10 minutes)
Enterprise (OV-101)/ shuttle carrier demate, Edwards
In late 1977 shuttle orbital missions were due to start in 1979. The orbiting Skylab space station was not expected to decay until 1983. A plan to save Skylab was developed. In Phase 1a small Skylab Reboost Module would be docked to Skylab on the second Shuttle flight. This would boost the station to a higher orbit for later use, and also provide the capability of deorbiting the station into empty ocean if the decision was taken to abandon it. Astronauts Haise and Lousma were selected for this flight, and development of the reboost module was begun. But it was not to be. Aside from intense resistance from some factions at NASA headquarters, higher solar activity resulted in heavier than predicted drag on Skylab. The shuttle program also was hit with delays. Before the first shuttle flew, Skylab burned up in the atmosphere and crashed into the Australian outback on July 11, 1979.
First flight of Space Transportation System (aka Space Shuttle).. Payloads: Development Flight Instrumentation and Aerodynamic Coefficient Identification Package.
Second shuttle test flight. Payloads: Office of Space and Terrestrial Applications (OSTA)-1 experiments, Orbiter Experiments (OEX).
Manned two crew. Payloads: Office of Space Science (OSS) experiments, Monodisperse Latex Reactor (MLR), Electro-phoresis Verification Test (EEVT), Plant Lignification Experiment. First and only landing by a shuttle at White Sands, New Mexico, after weather at Edwards did not permit landing there.
Manned two crew. Fourth space shuttle test flight. Payloads: Induced Environment Contamination Monitor (IECM), Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES), Development Flight Instrumentation (DFl), Orbiter Experiments (OEX), first NASA getaway special (GAS), Night/Day Optical Survey of Lightning (NOSL) experiment, Vapor Phase Compression (VPC) freezer heat exchanger dynamics for freezing samples, Aerodynamic Coefficient Identification Package (AClP) experiment.
Manned four crew. First mission to deploy commercial communications satellites (SBS 3, Anik C3). Payloads: : Satellite Business Systems (SBS)-C with Payload Assist ; (PAM)-D; Telesat-E (Canadian communications satellite) with PAM-D. Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES), three getaway specials (GAS), Student experiments, GLOW experiment, Vestibular experiment, Oxygen Interaction With Materials experiment.
Manned four crew. First flight of space shuttle Challenger; deployed TDRSS. Payloads: Deployment of Tracking and Data Relay Satellite (TDRS)-A with Inertial Upper Stage (lUS)-2, Continuous Flow Electrophoresis System (CFES), Monodisperse Latex Reactor (MLR), Night/Day Optical Survey of Lightning (NOSL) experiment, three getaway specials (GAS).
Tested EMU Manoeuvring Unit. Tested EVA emergency procedures.
Manned five crew. Deployed Anik C2, Palapa B1; deployed and retrieved SPAS platform. Payloads: Office of Space and Terrestrial Applications (OSTA)-2 experiments, deployment of PALAPA-B1 communications satellite for Indonesia with Payload Assist Module (PAM)-D and Telesat-F communications satellite for Canada with PAM-D, German Shuttle Pallet Satellite (SPAS)-01, seven getaway specials (GAS), Monodisperse Latex Reactor (MLR), Continuous Flow Electrophoresis System (CFES).
First night launch and night landing. Deployed Insat 1B. Payloads: Deployment of INSAT (lndia communica-tion satellite) with Payload Assist Module (PAM)-D, Payload Flight Test Article (PFTA)/ Payload Deployment Retrieval System (PDRS), Continuous Flow Electrophoresis (CFES), biomedical experiments. 250,000 express mail envelopes with special cachet for U.S. Postal Service were carried for a first-day cover.
Planned Department of Defense shuttle mission. Cancelled due to payload delays.
Space Shuttle orbiter Discovery at Vandenberg AFB for a series of fit checks at the orbiter lifting frame.
Carried ESA Spacelab. Payloads: Payload: Spacelab-1 experiments, habitable Spacelab and pallet, carried 71 experiments. The six-man crew was divided into two 12-hour-day red and blue teams to operate experiments. First high-inclination orbit of 57 degrees.
Manned five crew. Deployed Westar 6, Palapa B2; tested Manned Maneuvering Unit (MMU). Payloads: PALAPA-B2 (Indonesian communications satellite) with Payload Assist Module (PAM)-D and WESTAR (Western Union communications satellite)-Vl with PAM-D. Both satellites were deployed but the PAM-D in each satellite failed to ignite, leaving both satellites in earth orbit. Both satellites were retrieved and returned to earth for renovation on the STS-51-A mission. The manned maneuvering unit (MMU) was tested with extravehicular astronauts as free flyers without tethers as far as 98 m from the orbiter. Shuttle Pallet Satellite (SPAS)-01 experiments, Monodisperse Latex Reactor (MLR), Isoelectric Focusing Experiment (lEF), Acoustic Containerless Experiment System (ACES), Cinema 360 cameras, five getaway specials (GAS), Aerodynamic Coefficient Identification (ACIP)/High Resolution Accelerom-eter Package (HIRAP).
Tested MMU manoeuvring unit in free flight.
Tested MMU manoeuvring unit in free flight.
Planned TDRS/IUS deployment shuttle mission. Cancelled after Challenger disaster.
Manned five crew. First repair on orbit of a satellite, Solar Maximum Mission, by James van Hoften and George Nelson. Deployed LDEF. Payloads:Solar Maximum Mission (SMM) repair, manned maneuvering unit (MMU) satellite support, deployment of Long-Duration Exposure Facility (LDEF) in earth orbit free drift. LDEF contained 57 experiments and weighed about 10,000 kg. Cinema 360 and IMAX 70-mm cameras.
Attempted capture of Solar Max satellite.
Successfully captured and repaired Solar Max satellite.
Planned Department of Defense shuttle mission. Cancelled due to IUS failure.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled due to payload delays.
Manned six crew. First flight of space shuttle Discovery; deployed SBS 4, Leasat 1, Telstar 3C. Payloads: Satellite Business System (SBS)-D commu-nications satellite with Payload Assist Module (PAM)-D deployment, Syncom IV-2 communica-tions satellite with its unique stage deployment, Telstar (American Telephone and Telegraph) 3-C with PAM-D deployment, Office of Aeronautics and Space Technology (OAST)-1 experiments. Deployment and restowing of large solar array. Continuous Flow Electrophoresis (CFES). IMAX camera.
Planned Department of Defense or TDRS deployment shuttle mission. Cancelled due to IUS failure.
Manned seven crew. Deployed ERBS; performed high resolution Earth imagery. Payloads: Earth Radiation Budget Satellite (ERBS) deployment, Office of Space and Terrestrial Applications (OSTA)-3 experiments, Large Format Camera (LFC). First use of Orbital Refueling System (ORS) with extravehicular activity (EVA) astronauts, IMAX camera. In response to the American Strategic Defence Initiative and continued military use of the shuttle, the Soviet Union fired a 'warning shot' from the Terra-3 laser complex at Sary Shagan. The facility tracked Challenger with a low power laser on 10 October 1984. This caused malfunctions to on-board equipment and discomfort / temporary blinding of the crew, leading to a US diplomatic protest.
Simulated refuelling of satellite.
Manned five crew. First retrieval of two satellites (PALAPA B-2 and WESTAR Vl) for return to earth. Deployed Anik D2, Leasat 2; recovered Westar 6, Palapa B2. Payloads: Telesat (Canada communications satellite)-H with Payload Assist Module (PAM)-D deploy-ment, Syncom IV-1 communications satellite deployment with its unique stage, retrieval of PALAPA B-2 and WESTAR VI communications satellites with PAM-D which failed to ignite on the STS-41-B mission. Manned maneuvering unit (MMU) used for retrieval. Diffusive Mixing of Organic Solutions (DMOS) experiment.
![]() | Shuttle Orbiter - Shuttle Orbiter side view Credit: © Mark Wade. 1,859 bytes. 402 x 158 pixels. |
Retrieved Palapa satellite.
Retrieved Westar satellite.
The Space Shuttle orbiter Enterprise arrived at Vandenberg AFB for a series of facility verification tests.
Manned five crew. Deployed USA 8 (Aquacade ELINT spacecraft). Orbits of Earth: 48. Landed at: Runway 15 at Kennedy Space Center, Florida. Landing Speed: 342 kph. Touchdown miss distance: 839.00 m. Landing Rollout: 2,240.00 m. Payloads: Department of Defence classified payloads.
Planned TDRS/IUS deployment shuttle mission. Cancelled due to IUS failure.
Planned shuttle mission. Cancelled due to payload delays.
Manned seven crew. Payloads: Telesat (Canada communications satellite)-I with Payload Assist Module (PAM)-D deployment, Syncom IV-3 communications satellite deploy-ment with its unique stage (unique stage failed to ignite), Continuous Flow Electrophoresis (CFES), Phase Partitioning Experiment (PPE), student experiments, two getaway specials (GAS) Informal science studies (Toys in Space).
RMS 'Ryswatters' installed.
Manned seven crew. Deployed Nusat; carried Spacelab 3. Payloads: Spacelab-3 experiments, habitable Spacelab and mission peculiar experiment support structure. The experiments represented a total of five different disciplines: materials processing in space, environmental observa-tions, life science, astrophysics, and technology experiments. Two getaway specials (GAS). The flight crew was split into gold and silver shifts working 12-hour days during the flight.
Deployed and retrieved Spartan 1; launched Morelos 1, Arabsat 1B, Telstar 3D.Payloads: Shuttle Pointed Autono-mous Research Tool for Astronomy (SPARTAN)-1; Automated Directional Solidification Furnace (ADSF); High Precision Tracking Experiment (HPTE); Orbiter Experiments (OEX); French Echocardiograph Experiment (FEE) and French Pocket Experiment (FPE).
Planned TDRS/IUS deployment shuttle mission. Cancelled due to IUS failure.
Manned seven crew. At 5 minutes, 45 seconds into ascent the number one engine shut down prematurely and an abort to orbit was declared. Despite the anomaly the mission continued. Launched PDP; carried Spacelab 2. Payloads: Spacelab-2 with 13 experiments, Shuttle Amateur Radio Experiment (SAREX), Protein Crystal Growth (PCG). The flight crew was divided into a red and blue team. Each team worked 12-hour shifts for 24-hour-a-day operation.
Manned five crew. Launched Aussat 1, ASC 1, Leasat 4; repaired Leasat 3. Payloads: Deploy ASC (American Satellite Company)-1 with Payload Assist Modue (PAM)-D. Deploy AUSSAT (Australian communications satellite)-1 with PAM-D. Deploy Syncom IV-4 communications satellite with its unique stage. Retrieve Leasat-3 communications satellite, repair and deploy by extravehicular activity (EVA) astronauts. Physical Vapor Transport Organic Solids (PVTOS) experiment.
Captured Syncom F3 and began repairs.
Completed Syncom F3 repairs and redeployed satellite.
Manned five crew. Atlantis (first flight); deployed USA 11, USA 12. Reusable space transportation system.
Orbits of Earth: 63. Landed at: Runway 23 dry lake bed at Edwards Air Force Base, . Touchdown miss distance: 754.00 m. Landing Rollout: 2,455.00 m. Payloads: Classified DoD Mission - Record altitude (as of 5/93).
Space Launch Complex 6, site of future Space Shuttle operations, declared operational. However, much additional work and testing required.
Manned eight crew. Launched GLOMR; carried Spacelab D1. Payloads: Spacelab D-1 with habitable module and 76 experiments. Six of the eight crew members were divided into a blue and red team working 12-hour shifts for 24-hour-a-day operation. The remaining two crew members were 'switch hitters.'.
Planned EOM-1/2 shuttle mission. Cancelled due to payload delays.
Released from STS 61B 11/30/85; shuttle autopilot software test target. Spacecraft engaged in practical applications and uses of space technology such as weather or communication (US Cat C).
Manned seven crew. Deployed Morelos 2, Aussat 2, Satcom K2, OEX. Payloads: Deploy SATCOM (RCA-Satellite Communi-cations) Ku-2 with Payload Assist Module (PAM)-D II. Deploy Morelos (Mexico communications satellite)-B with PAM-D. Deploy AUSSAT (Australian communications satellite)-2 with PAM-D. EASE/ACCESS (Assembly of Structures� Assembly Concept for Construction of Erectable Space Structures) by extravehicular activity (EVA) astronauts, Continuous Flow Electrophore-sis System (CFES), Diffusive Mixing of Organic Solutions (DMOS), IMAX camera, one getaway special (GAS), Linhof camera and Hasseblad camera.
Began EASE/ACCESS (Assembly of Structures / Assembly Concept for Construction of Erectable Space Structures) structural assembly experiments.
Completed EASE/ACCESS (Assembly of Structures / Assembly Concept for Construction of Erectable Space Structures) structural assembly experiments.
Manned seven crew. Launched Satcom K1. Payloads: Deploy SATCOM (RCA-Satellite Communi-cations) Ku-1 with Payload Assist Module (PAM)-D II. Materials Science Laboratory, Comet Halley Active Monitoring Experiment (CHAMP), Hitchhiker (HH) Goddard (G)-1, thirteen getaway specials (GAS), student experiment, Initial Blood Storage Equipment (lBSE), Characterization of Space Motion Sickness (SMS).
Exploded 73 seconds after launch, all 7 crewmembers were killed; carried TDRSS satellite.
Planned Astro-1 shuttle mission. Cancelled after Challenger disaster.
Planned shuttle mission for deployment of Ulysses spacecraft. Cancelled after Challenger disaster.
Planned shuttle mission for deployment of Galileo spacecraft. Cancelled after Challenger disaster.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster.
Planned Department of Defense shuttle mission. Cancelled after Challenger disaster. Would have been first launch from the ill-fated SLC-6 launch site at Vandenberg, California.
Planned TDRS/IUS deployment shuttle mission. Cancelled after Challenger disaster.
Planned shuttle mission for deployment of Hubble space telescope. Cancelled after Challenger disaster.
Planned Department of Defense shuttle mission. Cancelled after Challenger disaster.
Planned shuttle LDEF (Long Duration Exposure Facility) recovery mission. Cancelled after Challenger disaster.
Planned Department of Defense shuttle mission. Cancelled after Challenger disaster.
Planned EOM-1 shuttle mission. Cancelled after Challenger disaster. No crew named, later combined with STS-61K
Planned shuttle mission for deployment of commercial communications satellites. Would have launched the first American journalist in space from Launch Complex 39B. Cancelled after Challenger disaster.
Planned shuttle mission. Cancelled after Challenger disaster.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster.
Planned Astro-2 shuttle mission. Cancelled after Challenger disaster.
Planned shuttle mission for deployment of commercial communications satellites. Cancelled after Challenger disaster.
Planned SLS-1 shuttle mission. Cancelled after Challenger disaster.
Planned shuttle mission. Cancelled after Challenger disaster.
Planned Astro-3 shuttle mission. Cancelled after Challenger disaster.
Planned Spacelab-J shuttle mission. Cancelled after Challenger disaster.
Air Force Secretary Edward C. Aldridge, Jr., directed the Air Force to begin mothballing the Space Shuttle program at Vandenberg AFB.
Planned SLS-2 shuttle mission. Cancelled after Challenger disaster.
Planned Spacelab-D1 shuttle mission. Cancelled after Challenger disaster. No crew selected; renamed STS-61A
Manned five crew. First shuttle reflight after Challenger disaster. Deployed TDRS 3. Payloads: Deploy IUS (lnertial Upper Stage) with Tracking and Data Relay Satellite (TDRS)-C. 3M's Physical Vapor Transport Organics Solids 2 experiment (PVTOS), Automated Directional Solidification Furnace (ADSF), Infrared Communi-cations Flight Experiment (lRCFE), Protein Crystal Growth Il (PCG), Isoelectric Focusing (ISF)-2, Phase Partitioning Experiment (PPE), Aggrega-tion of Red Blood Cells (ARC)-2, Mesoscale Lightning Experiment (MLE)-1, Earth Limb Radiance (ELRAD), Orbiter Experiments (OEX), Autonomous Supporting Instrumentation System (OASlS)-I, two Shuttle Student Involvement Project (SSIP) experiments.
Manned five crew. Deployed a classified payload. Orbits of Earth: 68. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 359 kph. Touchdown miss distance: 447.00 m. Landing Rollout: 2,171.00 m. Payloads: DoD Mission.
Manned five crew. Deployed TDRS 4. Payloads: Deploy IUS (Inertial Upper Stage) with Tracking and Data Relay Satellite (TDRS)-D. Protein Crystal Growth (PCG); Chromosome and Plant Cell Division in Space; IMAX 70mm camera; Shuttle Student Involvement Project (SSIP) experiments: SSIP 82-8, Effects of Weightlessness in Space Flight on the Healing of Bone Fractures, and SSIP 83-9, Chicken Embryo Development in Space; Air Force Maui Optical Site (AMOS) experiment.
Manned five crew. Deployed Magellan Venus probe. Payloads: Deploy IUS with Magellan spacecraft. Fluids Experiment Apparatus (FEA). Mesoscale Lightning Experiment (MLE), Air Force Maui Optical Site (AMOS) experiment.
Manned five crew. Deployed 2 classified satellites. Landed at: Runway 17 dry lake bed at Edwards Air Force Base, . Landing Speed: 287 kph. Touchdown miss distance: 1,618.00 m. Landing Rollout: 1,833.00 m. Payloads: DoD Mission.
Manned five crew. Deployed Galileo .Payloads: Deploy IUS with Galileo spacecraft. Shuttle Solar Backscatter Ultraviolet (SSBUV), Polymer Morphology (PM) experiments, IMAX camera project, Mesoscale Lightning Experiment (MLE), Air Force Maui Optical Site (AMOS) experiment, Growth Hormone Concentration and Distribution (GHCD) in Plants experiment, Sensor Technology Experiment (STEX), SSIP Student Experiment (SE) 82-15, Ice Crystals Experiment. First flight at this inclination.
Manned five crew. Deployed a classified payload. Orbits of Earth: 78. Distance traveled: 3,218,687 km. Landed at: Concrete runway 04 at Edwards Air Force Base, Cali. Landing Speed: 368 kph. Touchdown miss distance: 570.00 m. Landing Rollout: 2,366.00 m. Payloads: DoD Mission - third space shuttle night launch.
Manned five crew. Deployed Leasat 5, retrieved LDEF. Night landing. Payloads: Deployment of Syncom IV-5, retrieval of Long Duration Exposure Facility (LDEF), Fluids Experiment Apparatus (FEA)-3, Protein Crystal Growth (PCG) III-2, Latitude/Longitude Locator (L3), American Flight Echocardiograph (AFE), Characterization of Neurospora Circadian Rhythms in Space (CNCR)-01, Air Force Maui Optical Site (AMOS)-4, Mesoscale Lightning Experiment (MLE), IMAX, Interim Operational Contamination Monitor (lOCM).
Manned five crew. Deployed a classified payload. Landed at: Runway 23 dry lake bed at Edwards Air Force Base, . Landing Speed: 368 kph. Touchdown miss distance: 494.00 m. Landing Rollout: 2,407.00 m. Payloads: DoD Mission - Record altitude (through 5/93).
Deployed HST (Hubble Space Telescope). Payloads: Deployment of Hubble Space Telescope, IMAX camera in payload bay and in crew compartment, Protein Crystal Growth III-03, Investigation Into Polymer Membrane Process-ing- 01, Air Force Maui Optical Site-05, Radiation Monitoring Equipment III-01, Student Experiment 82-16, and Ascent Particle Monitor 01.
Manned five crew. Deployed Ulysses spacecraft. Payloads: Deploy Ulysses, Shuttle Solar Backscatter Ultraviolet, Intelsat Solar Array Coupon, Solid-Surface Combustion Experiment, Investigations Into Polymer Membrane Processing, Chromo-some and Plant Cell Division in Space, Physiological Systems Experiment, Voice Command System, Radiation Monitoring Equipment III, Air Force Maui Optical Site.
Manned five crew. Deployed a classified payload. Orbits of Earth: 79. Landed at: Runway 33 at Kennedy Space Center, Florida. Landing Speed: 359 kph. Touchdown miss distance: 430.00 m. Landing Rollout: 2,712.00 m. Payloads: DoD Mission.
Manned seven crew. Carried ASTRO-1 observatory. Payloads: Ultraviolet Astronomy TeIescope (Astro), Broad-Band X-Ray Telescope (BBXRT), Shuttle Amateur Radio Experiment (SAREX), Air Force Maui Optical Site (AMOS).
Manned five crew. Unscheduled EVA to manually deploy the Gamma-Ray Observatory's high-gain antenna, which failed to deploy upon ground command. Payloads: Gamma-Ray Observatory (GRO), Crew/ Equipment Translation Aids (part of Extravehicular Activity Development Flight Experiment), Ascent Particle Monitor (APM), Bioserve Instrumentation Technology Associates Materials Dispersion Apparatus (BlMDA), Protein Crystal Growth (PCG)-Block Il, Space Station Heatpipe Advanced Radiator Element (SHARE)-ll, Shuttle Amateur Radio Experiment (SAREX)-ll, Radiation Monitoring Equipment (RME)-lIl, Air Force Maui Optical Site (AMOS) Calibration Test.
Manually deployed Gamma-Ray Observatory's high-gain antenna.
Tested CETA (Crew / Equipment Translation Aids - rail with cart for moving astronauts around exterior of International Space Station).
Classified subsatellite released from shuttle.
Manned seven crew. Deployed USA 70, CRO A, CRO B, CRO C; deployed and retrieved IBSS. Payloads: Infrared Background Signature Survey (lBSS), Air Force Program (AFP)-675, Space Test Payload (STP)-I, Multi-Purpose Experiment Canister (MPEC), Cloud Logic to Optimize Use of Defense Systems (CLOUDS)-1A, Radiation Monitoring Equipment (RME)-lll.
Carried Spacelab life sciences module. Payloads: Spacelab Life Sciences (SLS)-1 with long module, getaway special bridge assembly with 12 getaway specials, Physiological Monitoring System (PMS), Urine Monitoring System (UMS), Animal Enclosure Modules (AEM), Middeck Zero-gravity Dynamics Experiment (MODE), 7 Orbiter Experiments Program experiments.
Manned five crew. Deployed TDRS 5 satellite. Payloads: Tracking and Data Relay Satellite (TDRS)-E/lnertial Upper Stage (lUS), Space Station Heatpipe Advanced Radiator Element (SHARE)-ll, Shuttle Solar Backscatter Ultraviolet (SSBUV) instrument 03, Optical Communications Through the Shuttle Window (OCTW), Air Force Maui Optical Site (AMOS) Calibration Test, Auroral Photography Experiment (APE)-B, Bioserve-lnstrumentation Technology Associates Materials Dispersion Apparatus (BlMDA)-02, Investigations Into Polymer Membrane Processing (IPMP)-03, Protein Crystal Growth Ill Block Il, Space Acceleration Measure-ment System (SAMS), Solid Surface Combustion Experiment (SSCE)-02, Tank Pressure Control Experiment (TPCE).
Manned five crew. Deployed UARS; conducted materials and biological research. Payloads: Upper Atmosphere Research Satellite (UARS), Ascent Particle Monitor (APM)-03, Physiological and Anatomical Rodent Experiment (PARE)-01, Protein Crystal Growth (PCG)-ll-2, Middeck Zero-Gravity Dynamics, Experiment (MODE)-01, Investigations Into Polymer Membrane Processing (IPMP)-04, Cosmic Radiation Effects and Activation Monitor (CREAM-02), Radiation Monitoring Equipment (RME)-lll-06, Shuttle Activation Monitor (SAM)-03, Air Force Maui Optical Site (AMOS) Calibration Test.
Manned six crew. Deployed Defense Support Program satellite. Payloads: Defense Support Program satellite/ Inertial Upper Stage, Interim Operational Contamination Monitor, Terra Scout, Military Man in Space, Shuttle Activation Monitor, Cosmic Radiation Effects and Activation Monitor, Radiation Monitoring Equipment Ill, Air Force Maui Optical Site Calibration Test, Ultraviolet Plume Instrument, Visual Function Tester 1.
Manned seven crew. Carried International Microgravity Laboratory-1. Payloads: International Microgravity Laboratory (lML)-1, getaway special (GAS) bridge with 10 getaway specials, IMAX camera, Gelation of Sols: Applied Microgravity Research (GOSAMR)-1, Investigations Into Polymer Mem-brane Processing (IPMP), Radiation Monitoring Equipment (RME)-lll, Student Experiment 81-09: Convection in Zero Gravity, Student Experiment 83-02: Capillary Rise of Liquid Through Granular Porous Media.
Manned seven crew. Carried ATLAS-1 experimental package. Payloads: Atmospheric Laboratory for Applications and Science (ATLAS)-1, Shuttle Solar Backscat-ter Ultraviolet (SSBUV)-4, Getaway Special Experiment G-229, Space Tissue Loss (STL)-1, Radiation Monitoring Equipment (RME)-lIl, Visual Function Tester (VFT)-lI, Cloud Logic To Opti-mize Use of Defense Systems (CLOUDS)-1A, Investigations Into Polymer Membrane Process-ing (IPMP), Shuttle Amateur Radio Experiment (SAREX)-Il, Ultraviolet Plume Instrument (UVPl).
Retrieved Intelsat 6 and attached new SRM. First active dual rendezvous of two orbiting spacecraft (Endeavour and Intelsat-Vl) First deployment of a drag chute on the orbiter fleet. Payloads: Intelsat-Vl reboost mission hardware, Assembly of Station by EVA Methods (ASEM), Commercial Protein Crystal Growth (CPCG), Air Force Maui Optical Site (AMOS) Calibration Test, Ultraviolet Plume Instrument (UVPl).
Attempted capture of Intelsat V1.
Second attempted capture of Intelsat V1.
Intelsat V1 finally captured in first three-person spacewalk.
Tested tools and techniques for assembly of the International Space Station.
Carried United States Microgravity Laboratory. First extended-duration mission. Payloads: United States Microgravity Laboratory (USML)-1; Orbital Acceleration Research Experiment (OARE); Investigations Into Polymer Membrane Processing (IPMP), Shuttle Amateur Radio Experiment (SAREX)-ll; Ultraviolet Plume Instrument (UVPl) .
Manned seven crew. Deployed Eureca-1; failed to deploy Italian tether probe TSS-1. Payloads: Tethered Satellite System (TSS)-1; European Retrievable Carrier (EURECA)-1L; Evaluation of Oxygen Integration with Materials (EOlM)-lll/ Thermal Energy Management Processes (TEMP)-2A; Consortium for Materials Development In Space Complex Autonomous Payloads (CONCAP)-ll and Ill; IMAX Cargo Bay Camera (ICBC); Limited Duration Space Environment Candidate Materials Exposure (LDCE); Pituitary Growth Hormone Cell Function (PHCF); Ultravio-let Plume Instrument (UVPl).
Manned seven crew. Carried Spacelab-J with microgravity and biology experiments. Payloads: Spacelab-J, nine getaway special canister experiments, Israel Space Agency Investigation About Hornets (ISAIAH), Shuttle Amateur Radio Experiment (SAREX) II, Solid Surface Combus-tion Experiment (SSCE).
Deployed Lageos 2, CTA. Payloads: Laser Geodynamic Satellite (LAGEOS) II/ Italian Research Interim Stage (IRIS), Canadian Experiments (CANEX) 2, United States Micro-gravity Payload (USMP) 1, Attitude Sensor Pack-age (ASP), Tank Pressure Control Experiment (TPCE), Physiological Systems Experiment (PSE), Heat Pipe Performance (HPP) experiment, Commercial Protein Crystal Growth (CPCG), Shuttle Plume Impingement Experiment (SPIE), Commercial Materials ITA Experiment (CMIX), Crystals by Vapor Transport Experiment (CVTE).
Canadian Target Assembly; deployed from STS-52 10/22/92.
Manned five crew. Deployed classified military satellite USA 89. The ODERACS payload was unable to be deployed because of payload equipment malfunction. Payloads: Department of Defense (DOD)1; Glow Experiment/Cryogenic Heat Pipe Experiment Payload (GCP); Orbital Debris Radar Calibration System (ODERACS); Battlefield Laser Acquisition Sensor Test (BLAST); Cloud Logic To Optimize Use of Defense Systems (CLOUDS) 1A; Cosmic Radiation Effects and Activation Monitor (CREAM); Fluid Acquisition and Resupply Equipment (FARE); Hand-held, Earth-oriented, Real-time, Cooperative, User-friendly, Location-targeting and Environmental System (HER-CULES); Microencapsulation in Space (MIS)-1; Radiation Monitoring Equipment (RME) III; Spare Tissue Loss (STL); Visual Function Tester (VFT)2.
Manned five crew. Deployed TDRSS 6. Payloads: Tracking and Data Relay Satellite (TDRS)-F/Inertial Upper Stage (IUS); Diffuse X-ray Spectrometer (DXS); Chromosome and Plant Cell Division in Space (CHROMEX); Commercial Generic Bioprocessing Apparatus (CGBA) A; Physiological and Anatomical Rodent Experiment (PARE) 02; Solid Surface Combustion Experiment (SSCE).
Tested tools and techniques for extravehicular activity.
Manned five crew. Carried Atlas-2; deployed and retrieved Spartan 201. Payloads: Atmospheric Laboratory for Applications and Science (ATLAS) 2, Shuttle Solar Backscat-ter Ultraviolet (SSBUV) A, Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) 201 (Solar Wind Generation Experi-ment), Solar Ultraviolet Experiment (SUVE), Commercial Material Dispersion Apparatus (CMIX), Physiological and Anatomical Rodent Experiment (PARE), Hand-held, Earth-oriented, Real-time, Cooperative, User-friendly, Location-targeting, and Environmental System (HER-CULES), Shuttle Amateur Radio Experiment (SAREX) II, Space Tissue Loss (STL), Air Force Maui Optical Site (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Radiation Monitoring Equipment (RME) III.
Manned seven crew. Carried German Spacelab-D2. Payloads: Spacelab D-2 with long module, unique support structure (USS), and Reaction Kinetics in Glass Melts (RKGM) getaway special, Shuttle Amateur Radio Experiment (SAREX) II.
Manned six crew. Carried Spacehab 1; retrieved Eureca-1 spacecraft. Payloads: Spacehab 01, retrieval of European Retriev-able Carrier (EURECA) Satellite, Superfluid Helium On-Orbit Transfer (SHOOT), Consortium for Materials Development in Space Complex Autonomous Payload (CONCAP)-IV, Fluid Acquisition and Resupply Experiment (FARE), Shuttle Amateur Radio Experiment (SAREX) II, Air Force Maui Optical Site (AMOS), GAS bridge assembly with 12 getaway special payloads.
Latched Eureca antenna. Conducted tests to refine procedures for servicing of the Hubble Space Telescope and construction of the International Space Station
Deployed and retrieved Orfeus-SPAS. During the EVA conducted tests in support of the Hubble Space Telescope first servicing mission and future EVAs, including Space Station assembly and maintenance. First night landing at KSC. Payloads: Advanced Communication Technology Sat-ellite (ACTS)/Transfer Orbit Stage (TOS), Orbiting Retrievable Far and Extreme Ultraviolet Spectrometer�Shuttle Pallet Satellite (ORFEUS-SPAS) with Remote IMAX Camera System (RICS), Limited Duration Space Environ-ment Candidate Materials Exposure (LDCE) (Beam Configuration C), Commercial Protein Crystal Growth (CPCG Block II), Chromosome and Plant Cell Division in Space (CHROMEX), High Resolution Shuttle Glow Spectroscopy-A (HRSGS-A), Auroral Photography Experiment-B (APE-B), Investigation into Polymer Membrane Processing (IPMP), Radiation Monitoring Equip-ment (RME-III), Air Force Maui Optical Site Cal-ibration Test (AMOS), IMAX In-Cabin Camera.
Tested tools and techniques for extravehicular activity.
Biological, microgravity experiments aboard Spacelab 2. Payloads: Spacelab Life Sciences (SLS) 2, Shuttle Amateur Radio Experiment (SAREX) II.
Manned seven crew. Hubble repair mission. Conducted the most EVAs (5) on a Space Shuttle Flight to that date. Payloads: Hubble Space Telescope (HST) Servicing Mission (SM) 1, IMAX Camera, IMAX Cargo Bay Camera (ICBC), Air Force Maui Optical Site (AMOS).
Hubble Space Telescope Servicing Mission 1 - gyroscope replacement.
Hubble Space Telescope Servicing Mission 1 - solar array replacement.
Hubble Space Telescope Servicing Mission 1 - WFPC-P installation.
Hubble Space Telescope Servicing Mission 1 - COSTAR installation.
Hubble Space Telescope Servicing Mission 1 - solar array drive replacement.
Deployed ODERACS A-F, Bremsat, carried Wake Shield Facility. Payloads: Wake Shield Facility (WSF) 1 and SPACEHAB 02. Getaway special bridge assembly experiments: Capillary Pumped Loop (CAPL), Orbital Debris Radar Calibration Spheres (ODERACS), University of Bremen Satellite (BREMSAT), G-514, G-071, and G-536. Shuttle Amateur Radio Experiment (SAREX) II; Auroral Photography Experiment (APE-B).
Carried USMP-2, OAST-2, SAMPIE, TES, EISG. Payloads: United States Microgravity Payload (USMP) 2, Office of Aeronautics and Space Technology (OAST) 2, Dexterous End Effector (DEE), Shuttle Solar Backscatter Ultraviolet/A (SSBUV/A), Limited-Duration Space Environment Candidate Material Exposure (LDCE), Advanced Protein Crystal Growth (APCG), Physiological Systems Experiment (PSE), Commercial Protein Crystal Growth (CPCG), Commercial Generic Bioprocessing Apparatus (CGBA), Auroral Photography Experiment Phase B (APE-B), Middeck Zero-Gravity Dynamics Experiment (MODE), Air Force Maui Optical Site (AMOS) Calibration Test, Bioreactor Demonstration System A.
Carried SIR-C SAR radar. Payloads: Space Radar Laboratory (SRL) 1; Consortium for Materials Development in Space Com-plex Autonomous Payload (CONCAP) IV; three getaway special (GAS) payloads; Space Tissue Loss (STL) A, B; Visual Function Tester (VFT) 4; Shuttle Amateur Radio Experiment (SAREX) II.
Carried IML-2; microgravity, biology experiments. Payloads: International Microgravity Laboratory (IML) 2, Orbital Acceleration Research Experiment (OARE), Commercial Protein Crystal Growth (CPCG), Air Force Maui Optical Site (AMOS), Military Applications of Ship Tracks (MAST), Shuttle Amateur Radio Experiment (SAREX).
Payloads: Lidar In-Space Technology Experiment (LITE), Shuttle Pointed Autonomous Research Tool for Astronomy (SPARTAN) 201-II, Robot-Operated Materials Processing System (ROMPS), Shuttle Plume Impingement Flight Experiment (SPIFEX), getaway special (GAS) bridge assembly with ten GAS experiments, Trajectory Control Sensor (TCS), Simplified Aid for EVA Rescue (SAFER), Solid Surface Combustion Experiment (SSCE), Biological Research in Canisters (BRIC) III, Radiation Monitoring Experiment (RME) III, Military Applications of Ship Tracks (MAST), Shuttle Amateur Radio Experiment (SAREX) II, Air Force Maui Optical Site (AMOS) Calibration Test.
Tested SAFER emergency manoeuvring backpack.
Carried SIR-C SAR. Landed at Edwards Air Force Base on October 11. Payloads: Space Radar Laboratory (SRL) 2, five Getaway Special payloads, Chromosome and Plant Cell Division in Space (CHROMEX) 5, Biological Research in Canisters (BRIC) 01, Cosmic Radiation Effects and Activation Monitor (CREAM), Military Application of Ship Tracks (MAST), Commercial Protein Crystal Growth (CPCG).
Carried Atlas-3 laboratory; deployed and retrieved CRISTA-SPAS. Payloads: Atmospheric Laboratory for Applications and Science (ATLAS) 3, Cryogenic Infrared Spectrometers and Telescopes for the Atmo-sphere (CRISTA)-Shuttle Pallet Satellite (SPAS) 1, Experiment of the Sun for Complement-ing the ATLAS Payload for Education (ESCAPE) II, Inter-Mars Tissue Equivalent Proportional Counter (ITEPC), Shuttle Solar Backscatter Ultraviolet (SSBUV) A, Physiological and Anatomical Rodent Experiment (PARE/NIH-R), Protein Crystal Growth (PCG-TES and PCG-STES), Space Tissue Loss (STL/NIH-C-A), Shuttle Acceleration Measurement System (SAMS), Heat Pipe Performance (HPP).
Tested tools and techniques for extravehicular activity.
Carried Astro 2 astronomy payload with 3 UV telescopes.(attached to Endeavour).Payloads: Ultraviolet Astronomy (ASTRO) 2; Middeck Active Control Experiment (MACE); Protein Crystal Growth�Thermal Enclosure System (PCG-TES) 03; Protein Crystal Growth�Single-Locker Thermal Enclosure System (PCG-STES) 02; Commercial Materials Dispersion Apparatus Minilab/Instrumentation Technology Associates, Inc. Experiments (CMIX) 03; Shuttle Amateur Radio Experiment (SAREX) II; two getaway special experiments.
Deployed TDRS 7. Payloads: Tracking and Data Relay Satellite (TDRS) G/ Inertial Upper Stage (IUS); Bioreactor Demon-stration System (BDS) B; Biological Research in Canisters (BRIC); Commercial Protein Crystal Growth (CPCG); Hand-Held, Earth-Oriented, Real-Time, Cooperative, User-Friendly, Location-Targeting and Environmental System (HER-CULES); Microcapsules in Space (MIS) B; Physiological and Anatomical Rodent Experiment (PARE)/National Institutes of Health (NIH) Rodents (R); Radiation Monitoring Experiment (RME) III; Shuttle Amateur Radio Experiment (SAREX) II; Space Tissue Loss (STL)/National Institutes of Health (NIH) Cells (C); Military Applications of Ship Tracks (MAST); Visual Function Tester (VFT) 4; Window Experiment (WINDEX).
Deployed and retrieved Spartan 201, WSF 2. Payloads: Wake Shield Facility (WSF) 2; Shuttle Pointed Autonomous Research Tool for As-tronomy (SPARTAN) 201; International Extreme Ultraviolet Hitchhiker (IEH)1; Inter-Mars Tissue Equivalent Proportional Counter (ITEPC); Extravehicular Activity Development Flight Test (EDFT) 2; Capillary Pumped Loop (CAPL) 2/ getaway special (GAS) bridge assembly with five GAS payloads; Auroral Photography Experiment (APE) B; Biological Research in Canisters (BRIC); Commercial Generic Bioprocessing Apparatus (CGBA), Configuration A; Electrolysis Perfor-mance Improvement Concept Study (EPICS); Space Tissue Loss (STL)/National Institutes of Health (NIH) Cells (C); Commercial Middeck Instrumentation Technology Associates Experiment (CMIX).
Tested tools and techniques for extravehicular activity.
Carried USML-2 for microgravity experiments (attached to Columbia). Payloads: United States Microgravity Laboratory (USML) 2, Orbital Acceleration Research Experiment (OARE).
Deployed and retrieved OAST Flyer; retrieved SFU Space Flyer Unit. Beside the two satellite retrievals, the mission included two spacewalks.
Tested tools and techniques for extravehicular activity.
Tested tools and techniques for extravehicular activity.
Carried TSS-1R tether satellite; satellite tether broke during deployment, making TSS-1R an unintentional free flyer
Payloads: Tethered Satellite System (TSS) Reflight (1R); Orbital Acceleration Research Experiment (OARE) (part of United States Microgravity Payload 3); USMP-3; Commercial Protein Crystal Growth (CPCG) 09, Block IV; Middeck Glovebox Experiment (MGBX) (part of USMP-3). During the deployment of TSS, the tether broke and the satellite was lost.
Deployed and retrieved Spartan 2; deployed PAMS-STU; carried Spacehab module. Payloads: Shuttle Pointed Research Tool for Astronomy (SPARTAN) 207/Inflatable Antenna Experiment (IAE); Technology Experiments Advancing Missions in Space (TEAMS) 01 (includes Vented Tank Resupply Experiment (VTRE), Global Positioning System (GPS) Attitude and Navigation Experiment (GANE) (RME 1316), Liquid Metal Test Experiment (LMTE) and Passive Aerodynami-cally Stabilized Magnetically Damped Satellite (PAMS) Satellite Test Unit (STU); SPACEHAB-4; Brilliant Eyes Ten-Kelvin Sorption Cryocooler Experiment (BETSCE); 12 getaway specials attached to a GAS bridge assembly (GAS 056, 063, 142, 144, 163, 200, 490, 564, 565, 703, 741 and the Reduced-Fill Tank Pressure Control Experiment (RFTPCE); Aquatic Research Facility (ARF) 01; Biological Research in Canisters (BRIC) 07, Block III.
Carried Life and Microgravity Spacelab; human biological and microgravity experiments. Landed KSC July 7.
Mission STS-80 carried the Orfeus astronomy satellite, the Wake Shield Facility, and spacewalk equipment. The Orfeus satellite was deployed on November 20. It carried an ultraviolet telescope and spectrographs. Wake Shield Facility was deployed on November 22 and retrieved on November 26 . On 1996 Nov 29, crewmembers Tamara Jernigan and Thomas Jones were to conduct the first of several planned EVAs. However the shuttle's exit hatch would not open and NASA cancelled this and the other planned spacewalks of the mission. On December 4 at the astronauts retrieved the Orfeus satellite using the RMS arm. Reentry attempts on Dec 5 and Dec 6 were called off due to bad weather. Columbia finally landed at 11:49 GMT December 7 on Runway 33 at Kennedy Space Center, making STS-80 the longest shuttle mission to that date .
After a spectacular night launch, the Shuttle completed its rendezvous with Hubble Space Telescope on February 13. Over the next four days five spacewalks were undertaken to renovate Hubble.
The Hubble Space Telescope was released back into orbit at 06:41 GMT on February 19. Discovery landed on Runway 15 at Kennedy Space Center at 08:32 GMT on February 21.
Hubble Space Telescope Servicing Mission 2 - NICMOS installation.
Hubble Space Telescope Servicing Mission 2 - Guidance sensor replacement.
Hubble Space Telescope Servicing Mission 2 - Data interface unit replacement.
Hubble Space Telescope Servicing Mission 2 - Solar array drive replacement.
Hubble Space Telescope Servicing Mission 2 - Insulation blanket repair.
The launch of STS-83, the first Microgravity Science Laboratory (MSL-1) mission, was postponed for a day to replace some insulation around a water coolant line in Columbia's payload bay. Liftoff was further delayed 20 minutes due to anomalous oxygen readings in the orbiter's payload bay. STS-83 was cut short due to a problem with one of the three fuel cells that provide electricity and water to Columbia (flight rules required that all three must be operating). At 14:30 GMT on April 6 the crew were ordered to begin a Minimum Duration Flight (MDF). On April 8 the OMS engines ignited at 17:30 GMT for the deorbit burn, and Columbia landed on Runway 33 at Kennedy Space Center at 18:33 GMT.
With delays in International Space Station construction leaving ample room in the shuttle schedule, NASA made the unique decision to leave the equipment installed in Columbia and refly this mission with the same crew later in 1997 as STS-94.
STS-94 was the reflight, with the same equipment and crew, of the curtailed STS-83 mission. Cargo Bay Payloads:
In-Cabin Payloads: SAREX, MSX
The mission this time went for its full two week duration and the crew completed the full list of experiments. The deorbit burn was on July 17, 1997 at 09:44 GMT and Columbia landed on KSC's Runway 33 at 10:46:34 GMT.
Deployed and retrieved the CRISTA-SPAS-2 (the Cryogenic Infrared Spectrometers and Telescopes for the Atmosphere-Shuttle Pallet Satellite-2) designed to study Earth's middle atmosphere. The CRISTA-SPAS-2 was making its second flight on the Space Shuttle and represented the fourth mission in a cooperative venture between the German Space Agency (DARA) and NASA.
CRISTA-SPAS was deployed by the RMS arm at 22:27 GMT on August 7 and was recaptured by Discovery's RMS arm at 15:14 GMT on August 16. Because of unfavorable weather conditions at the primary shuttle landing site at the Kennedy Space Center, Discovery was waved off for its scheduled August 18 landing. STS-85 landed the next day, at Kennedy Space Center at 11:08 GMT.
Remained attached to OV-104
OV-102 Columbia was launched on a microgravity science mission. Spartan 201 was released a day late on November 21. However the satellite did not start its automatic orientation maneuver because the crew failed to send it the correct commands prior to release.
Spartan was recaptured by hand, during a spacewalk by Takao Doi and Winston Scott on November 25. Tests of space station tools went well, but the free-flying Sprint camera subsatellite was not deployed due to lack of time.
NASA decided not to redeploy Spartan on this mission. During an EVA on Dec 3, Doi and Scott carried out more tests of the Space Station crane. They also deployed the AERCam/Sprint 'football' remote-controlled camera for a free flight in the payload bay.
Columbia landed on December 5, with a deorbit burn at 11:21 GMT. Touchdown was at 12:20 GMT at Kennedy Space Center.
Retrieved Spartan free-flier. Tested EVA tools and techniques.
Tested tools and techniques for extravehicular activity.
Columbia rolled out to pad 39B on March 23. Payloads:
The Neurolab mission was managed by NASA-Johnson at Houston, unlike earlier Spacelab flights which were NASA-Marshall/Huntsville's responsibility. Landed at Kennedy Space Center May 3 1998.
Following separation of the third stage and the primary Deep Space 1 payload, the Delta second stage manoeuvred from its 185 km parking orbit to a 174 km x 2744 km x 28.5 degree orbit. It then released the SEDSAT micro-satellite, built by the Huntsville, Alabama chapter of SEDS (the Students for the Exploration and Development of Space). SEDSAT has two amateur radio transponders and an earth imaging camera.
Retrieved by Discovery November 3 1998.
The flight of STS-95 provoked more publicity for NASA than any other flight in years, due to the presence of ex-astronaut Senator John Glenn on the crew, which also included the first Spanish astronaut, Pedro Duque. The US Navy PANSAT student satellite was deployed on Oct 30 into a 550 km x 561 x 28.5 degree orbit. The Spartan 201 satellite was deployed from Discovery on November 1 and retrieved on November 3. Spartan 201 was on its fifth mission to observe the solar corona. The data on this mission would be used to recalibrate the SOHO satellite which recently resumed observation of the Sun following loss of control. Discovery landed at 17:03:31 GMT November 7 on Runway 33 at the Shuttle Landing Facility at Kennedy Space Center.
STS-93 was first rolled out to pad 39B on June 7 1999. The Chandra/IUS-27 vehicle was placed in the payload canister on June 19. The first launch attempt was on July 20, but controllers aborted the launch at T-6 seconds, just before main engine ignition, due to a data spike in hydrogen pressure data. This was determined to be due to a faulty sensor and a second attempt was on July 22. A lightning storm prevented launch during the 46 minute window, and the launch was again scrubbed. Finally the vehicle lifted off the pad on July 23, but five seconds after launch a short in an electrical bus brought down two of the three main engine controllers. Backup controllers took over, but a further failure on the backup controller bus would have resulted in engine shutdown and the first ever attempt at an RTLS (Return To Launch Site) abort. To further complicate matters engine 3 (SSME 2019) had a hydrogen leak throughout the ascent, causing the engine to run hot. Controllers sweated as temperatures neared redline. The hot engine�s controller compensated as programmed by using additional liquid oxygen propellant. The final result was that the shuttle ran out of gas - main engine cut-off (MECO) was at 04:39 GMT, putting Columbia into a 78 km x 276 km x 28.5 degree transfer orbit. Columbia was 1,700 kg short of oxygen propellant and 5 meters/sec slower than planned. The OMS-2 engine burn at 05:12 GMT circularised the orbit 10 km lower than planned.
The orbiter payload bay contained only the Chandra spacecraft, the IUS, and the IUS tilt tableTthe following payloads were carried in the shuttle�s cabin: STL-B (Space Tissue Loss), CCM (Cell culture module), SAREX-II (Shuttle Amateur Radio Experiment), EarthKam, PGIM (Plant Growth Investigations in Microgravity), CGBA (Commercial Generic Bioprocessing Apparatus), MEMS (Micro-electric Mechanical System), and BRIC (Biological Research in Canisters) and SWUIS (the Southwest Ultraviolet Imaging System, an 0.18-m UV telescope to be used for airglow and planetary observations); GOSAMR (the Gelation of Sols: Applied Microgravity Research experiment) and LFSAH, the Lightweight Flexible Solar Array Hinge. MSX and SIMPLEX experiments were also to be carried out.
Chandra/IUS-27 was deployed from Columbia at 11:47 GMT July 23. Flight duration was limited; this was the heaviest shuttle (122,534 kg) and heaviest payload (19,736 kg) to that date. Columbia landed at 03:20 GMT on July 28 on runway 33 at Kennedy Space Center. Post-flight inspection found the presence of holes in the cooling lines on the nozzle of SSME 2019 (engine 3) which caused a hydrogen leak. A loose repair pin in the engine broke free and caused the failure. The cause of the short was found to be chaffed wiring inside the shuttle. The entire fleet was grounded for inspection and replacement of wiring as necessary.
Hubble Space Telescope (HST) servicing mission SM-3A, delayed repeatedly by technical problems with the shuttle fleet after the near-disastrous previous launch. Finally launched after the last possible day to avoid Y2K computer problems; one spacewalk was cancelled so that the shuttle could return by December 28. Hubble was in a 591 km x 610 km x 28.5 deg orbit at launch. After separation of the external tank ET-101 the Orbiter was in a 56 km x 587 km x 28.5 deg transfer orbit. The OMS 2 burn at 0134 UTC raised the orbit to 313 km x 582 km. The payload bay contained:
Replaced all six of the gyroscopes on Hubble.
Installed in the Hubble space telescope a new 486/25 mhz computer and replaced Fine Guidance Sensor FGS-2.
Completed part of the installation of new insulation to the Hubble space telescope. The rest was deferred to the next servicing mission.
On an extremely successful mission the space shuttle Endeavour deployed the 61 metre long STRM mast. This was a side-looking radar that digitally mapped with unprecedented accuracy the entire land surface of the Earth between latitudes 60 deg N and 54 deg S. Sponsors of the flight included the US National Imagery and Mapping Agency (NIMA), NASA, and the German and Italian space agencies. Some of the NIMA data would remain classified for exclusive use by the US Department of Defense.