Cluster of 4 240 inch solid motors used as first stage; upper stages as Nova 7S and 8L.
LEO Payload: 197,300 kg. to: 160 km Orbit. at: 0.0 degrees. Payload: 75,300 kg. to a: translunar trajectory. Liftoff Thrust: 9,027,710 kgf. Total Mass: 7,675,760 kg. Core Diameter: 11.6 m. Total Length: 120.0 m.
NASA Associate Administrator Robert C. Seamans, Jr., established the Ad Hoc Task Group for a Manned Lunar Landing Study, to be chaired by William A. Fleming of NASA Headquarters. The study was expected to produce the following information:
The engineering sketch drawn by John D. Bird of Langley Research Center on May 3, 1961, indicated the thinking of that period: By launching two Saturn C-2's, the lunar landing mission could be accomplished by using both earth rendezvous and lunar rendezvous at various stages of the mission.
Following Gagarin's flight and Bay of Pigs failure, Kennedy announces the objective of landing an American on the moon by end of the decade. In his second State of the Union Message President Kennedy said: "With the advice of the Vice President, who is Chairman of the National Space Council, we have examined where we (United States) are strong and where we are not, where we may succeed and where we may not. . . . Now is the time to take longer strides-time for a great new American enterprise-time for this Nation to take a clearly leading role in space achievement which in many ways may hold the key to our future on Earth." President Kennedy set forth an accelerated space program based upon the long-range national goals of landing a man on the Moon and returning him safely to Earth; early development of the Rover nuclear rocket; speed up the use of Earth satellites for worldwide communications; and provide "at the earliest possible time a satellite system for worldwide weather observation." An additional $549 million was requested for NASA over the new administration March budget requests; $62 million was requested for DOD for starting development of a solid-propellant booster of the Nova class.
![]() | Nova Concepts - NASA Credit: © Mark Wade. 13,422 bytes. 640 x 349 pixels. |
Meeting with Webb/Dryden, work on Saturn C-2 stopped; preliminary design of C-3 and continuing studies of larger vehicles for landing missions requested. STG push for 4 x 6.6 m diameter solid cluster first stage rejected for safety and ground handling reasons.