This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com Jupiter C

Jupiter C
Jupiter C - Jupiter C - COSPAR 1958-Alpha

10,275 bytes. 125 x 479 pixels.



Family: Redstone. Country: USA. Status: Hardware. Other Designations: Juno I.

Satellite launcher derived from Redstone IRBM. Redstone missiles were launched with upper stages to test Jupiter reentry vehicle configurations. The first US rocket with orbital launch capability. Von Braun's team was ordered to ballast the upper stage with sand to prevent any 'inadvertent' artificial satellites from stealing thunder from the official Vanguard program. Korolev's R-7 orbited the first earth satellite instead. The Jupiter C was retroactively named the 'Juno I' by Von Braun's team.


Specifications

Launches: 6. Failures: 3. Success Rate: 50.00% pct. First Launch Date: 01 February 1958. Last Launch Date: 23 October 1958. Liftoff Thrust: 37,630 kgf. Total Mass: 29,060 kg. Core Diameter: 1.8 m. Total Length: 23.0 m. Development Cost $: 92.50 million. in 1956 average dollars. Flyaway Unit Cost $: 1.99 million. in 1959 unit dollars. Cost comments: Development, flyaway cost for Redstone missile.


Jupiter C Chronology


1954 Jun 25 -
1954 Aug 15 -
1955 Aug 24 -
1956 Feb 1 -
1956 Sep 20 - - 06:45 GMT. LV Configuration: Redstone s/n RS-27. Launch Site: Cape Canaveral . Launch Complex: LC5. FAILURE: Early cut-off due to human error in tanking .
1957 May 15 - - 07:55 GMT. LV Configuration: Redstone s/n RS-34. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Loss of instrument compartment pressure at 134 seconds causing failure of pitch gyro prior to cut-off.
1957 Aug 7 -
1957 Aug 8 - - 06:59 GMT. LV Configuration: Redstone s/n CC-40. Launch Site: Cape Canaveral . Launch Complex: LC6.
1957 Oct 5 -
1957 Nov 8 -
1958 Feb 1 - - 03:55 GMT. LV Configuration: Redstone s/n RS-29. Launch Site: Cape Canaveral . Launch Complex: LC26A.
1958 Mar 5 - - 18:27 GMT. LV Configuration: Redstone s/n RS/CC-26. Launch Site: Cape Canaveral . Launch Complex: LC26A. FAILURE: Fourth Stage failed to ignite.
1958 Mar 26 - - 17:38 GMT. LV Configuration: Redstone s/n RS-24. Launch Site: Cape Canaveral . Launch Complex: LC05.
1958 Jul 26 - - 15:00 GMT. LV Configuration: Redstone s/n RS/CC-44. Launch Site: Cape Canaveral . Launch Complex: LC05.
1958 Aug 24 - - 06:17 GMT. LV Configuration: Redstone s/n RS/CC-47. Launch Site: Cape Canaveral . Launch Complex: LC05. FAILURE: First Stage collided with upper stages. Second Stage ignited in wrong direction.
1958 Oct 23 - - 03:22 GMT. LV Configuration: Redstone s/n RS/CC-49. Launch Site: Cape Canaveral . Launch Complex: LC05. FAILURE: Upper stages separated prior to burnout. Structural failure after 149 sec due to vibration disturbances generated by the spinning payload.

Bibliography:



Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .