This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com

astronautix.com Redstone

Wresat launch
Wresat launch -

6,054 bytes. 111 x 296 pixels.



Family: Redstone. Country: USA. Status: Hardware.

Redstone was the first large liquid rocket developed in the US using German V-2 technology. Originally designated Hermes C1. Redstones later launched the first US satellite and the first American astronaut into space.


Specifications

Launches: 11. Failures: 2. Success Rate: 81.82% pct. First Launch Date: 21 November 1960. Last Launch Date: 29 November 1967. Liftoff Thrust: 37,470 kgf. Total Mass: 28,440 kg. Core Diameter: 1.8 m. Total Length: 21.0 m. Development Cost $: 92.50 million. in 1956 average dollars. Launch Price $: 4.93 million. in 1985 price dollars. Total Development Built: 35. Total Production Built: 85. Flyaway Unit Cost $: 1.99 million. in 1959 unit dollars.


Redstone Chronology


1943 Nov 1 -
1944 Nov 20 -
1946 Jun 1 -
1947 Jan 23 - Launch Site: White Sands .
1948 Sep 15 -
1949 Jun 1 -
1949 Oct 28 -
1950 Jul 10 -
1950 Sep 11 -
1951 Jul 10 -
1951 Oct 31 -
1952 Apr 1 -
1952 Apr 8 -
1952 Oct 1 -
1953 Aug 20 - LV Configuration: Redstone s/n RS-1. Launch Site: Cape Canaveral . Launch Complex: LC4. FAILURE: Control System malfunction followed by Power Plant malfunction at approximately 80 sec. Ground cut-off command given..
- 1954 January - LV Configuration: Redstone s/n RS-2. Launch Site: Cape Canaveral . Launch Complex: LC4.
- 1954 May - LV Configuration: Redstone s/n RS-3. Launch Site: Cape Canaveral . Launch Complex: LC4. FAILURE: Ejector burnout immediately following lift-off.
- 1954 August - LV Configuration: Redstone s/n RS-4. Launch Site: Cape Canaveral . Launch Complex: LC4. FAILURE: Steam generator regulator malfunction caused drop in combustion pressure.
1954 Sep 29 -
- 1954 October - LV Configuration: Redstone s/n RS-6. Launch Site: Cape Canaveral . Launch Complex: LC4. FAILURE: Ground programmed yaw maneuver caused missile control loss at 80 sec causing power plant erratic behavior. Human error in selection of yaw maneuver impulse.
1954 Dec 31 -
- 1955 February - LV Configuration: Redstone s/n RS-8. Launch Site: Cape Canaveral . Launch Complex: LC4. FAILURE: Separation bolt No. 3 failure. Inverter frequency shift.
- 1955 April - LV Configuration: Redstone s/n RS-9. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Guidance system malfunction at 310 sec due to air pressure lose. ST-80 lateral guidance only.
1955 May 23 - Launch Site: Cape Canaveral .
- 1955 May - LV Configuration: Redstone s/n RS-10. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Guidance system malfunction at 155, sec due to wiring error.
1955 Jun 15 -
- 1955 August - LV Configuration: Redstone s/n RS-7. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Excessive temperature in tail section caused malfunction of jet vane control.
1956 Apr 15 -
1956 Apr 23 -
1957 Sep 9 -
1957 Nov 7 -
1958 Mar 27 -
- 1988 May - LV Configuration: Redstone s/n CC-1002. Launch Site: Cape Canaveral . Launch Complex: LC5.
1958 Jun 1 -
- 1958 June - LV Configuration: Redstone s/n CC-1004. Launch Site: White Sands . Launch Complex: ALA3.
- 1958 June - LV Configuration: Redstone s/n CC-54. Launch Site: Cape Canaveral . Launch Complex: LC6.
1958 Jul 31 - - 09:50 GMT. LV Configuration: Redstone s/n CC-50. Launch Site: Johnson Island . Launch Complex: LC1. FAILURE: Failure of tilt program device at lift-off causing vertical night flight did not preclude subsequent system operations and successful mission accomplishment.
1958 Aug 11 - - 09:30 GMT. LV Configuration: Redstone s/n CC-51. Launch Site: Johnson Island . Launch Complex: LC2. FAILURE: Guidance system malfunction at 70 seconds which did not preclude subsequent system operations and successful mission accomplishment.
- 1958 September - LV Configuration: Redstone s/n CC-56. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Programmed maneuver at re-entry and impact in deep water. Accurate survey not possible. CC-57.
1958 Oct 24 -
1958 Nov 6 - LV Configuration: Redstone s/n CC-57. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Boost phase normal. Space phase malfunction.
- 1959 January - LV Configuration: Redstone s/n CC-1010. Launch Site: White Sands . Launch Complex: ALA3. FAILURE: Human error in connecting separation system.
- 1959 February - LV Configuration: Redstone s/n CC-101l. Launch Site: White Sands . Launch Complex: ALA3. FAILURE: Improper setting of thrust controller and malfunction of tilt program at 17 sec.
1959 Mar 15 - LV Configuration: Redstone s/n CC-1016. Launch Site: White Sands . Launch Complex: ALA3.
- 1959 May - LV Configuration: Redstone s/n CC-1013. Launch Site: White Sands . Launch Complex: ALA3. FAILURE: Known initial laying error of approximately 26 min.
1959 Aug 4 - LV Configuration: Redstone s/n CC-2004. Launch Site: Cape Canaveral . Launch Complex: LC26A. FAILURE: Pre-launch tanking error caused early cut-off by fuel depletion.
- 1959 September - LV Configuration: Redstone s/n CC-1018. Launch Site: White Sands . Launch Complex: ALA3.
1959 Sep 21 - LV Configuration: Redstone s/n CC-2003. Launch Site: Cape Canaveral . Launch Complex: LC26A. FAILURE: Control system malfunction during re-entry at 380 sec.
1960 Jan 26 - LV Configuration: Redstone s/n CC-2011. Launch Site: White Sands . Launch Complex: ALA3.
1960 Mar 15 - LV Configuration: Redstone s/n CC-2014. Launch Site: White Sands . Launch Complex: ALA3?.
1960 Mar 21 - LV Configuration: Redstone s/n CC-2020. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Control system malfunction during re-entry at 373 sec.
1960 Apr 15 - LV Configuration: Redstone s/n CC-2021. Launch Site: White Sands . Launch Complex: ALA3.
1960 Jun 10 - LV Configuration: Redstone s/n CC-2022. Launch Site: White Sands . Launch Complex: ALA3.
- 1960 July - LV Configuration: Redstone s/n CC-1019. Launch Site: White Sands .
1960 Aug 9 - LV Configuration: Redstone s/n CC-2023. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Erroneously destroyed during boost by range personnel.
1960 Oct 5 - LV Configuration: Redstone s/n CC-2037. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Control system malfunction during re-entry at 375 sec.
1961 Jan 21 - LV Configuration: Redstone s/n CC-2038. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Control system malfunction during re-entry at 370 sec.
1961 Mar 8 - LV Configuration: Redstone s/n CC-2040. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Control system malfunction during re-entry at 374 sec.
1961 May 17 - LV Configuration: Redstone s/n CC-2042. Launch Site: Cape Canaveral . Launch Complex: LC6.
1961 Jun 28 - LV Configuration: Redstone s/n CC-2043. Launch Site: Cape Canaveral . Launch Complex: LC6. FAILURE: Air vane actuator malfunction at 262 sec.
- 1961 July - LV Configuration: Redstone s/n CC-1005. Launch Site: White Sands .
- 1961 August - LV Configuration: Redstone s/n CC-1009. Launch Site: White Sands . FAILURE: Human error in laying launch azimuth. Drop in inter-compartment pressure suspected.
- 1961 September - LV Configuration: Redstone s/n CC-1006�. Launch Site: White Sands .
- 1961 October - LV Configuration: Redstone s/n CC-1012. Launch Site: White Sands .
- 1961 December - LV Configuration: Redstone s/n CC-1008. Launch Site: White Sands .
- 1962 June - LV Configuration: Redstone s/n CC-1014. Launch Site: White Sands .
- 1962 July - LV Configuration: Redstone s/n CC-1017. Launch Site: White Sands .
- 1962 August - LV Configuration: Redstone s/n CC-1007. Launch Site: White Sands .
1963 Aug 5 - LV Configuration: Redstone s/n CC-2033. Launch Site: White Sands .
1963 Aug 19 - LV Configuration: Redstone s/n CC-2008. Launch Site: White Sands .
1963 Sep 10 - LV Configuration: Redstone s/n CC-2015. Launch Site: White Sands . FAILURE: Control system malfunction immediately prior to impact.
1963 Sep 23 - LV Configuration: Redstone s/n CC-2044. Launch Site: White Sands .
1963 Oct 5 - LV Configuration: Redstone s/n CC-2005. Launch Site: White Sands .
1964 Jun 25 -
1964 Oct 30 -
1964 Dec 1 -
1965 Nov 29 - Launch Site: San Nicholas .
1966 Nov 28 - - 12:15 GMT. LV Configuration: Redstone SV-1. Launch Site: Woomera . Launch Complex: LA8. FAILURE: Failure.
1966 Dec 13 - - 11:50 GMT. LV Configuration: Redstone s/n CC-2034/SV-2. Launch Site: Woomera . Launch Complex: LA8.
1967 Apr 20 - - 08:00 GMT. LV Configuration: Redstone SV-3. Launch Site: Woomera . Launch Complex: LA8.
1967 Jul 5 - - 23:07 GMT. LV Configuration: Redstone s/n CC-2032/SV-4. Launch Site: Woomera . Launch Complex: LA8.
1967 Jul 25 - - 16:43 GMT. LV Configuration: Redstone s/n CC-2009/SV-5. Launch Site: Woomera . Launch Complex: LA8.
1967 Aug 18 - - 19:46 GMT. LV Configuration: Redstone s/n CC-2039/SV-6. Launch Site: Woomera . Launch Complex: LA8.
1967 Sep 16 - - 16:17 GMT. LV Configuration: Redstone s/n CC-2012/SV-7. Launch Site: Woomera . Launch Complex: LA8.
1967 Oct 12 - - 16:22 GMT. LV Configuration: Redstone s/n CC-2030/SV-8. Launch Site: Woomera . Launch Complex: LA8.
1967 Oct 31 - - 13:14 GMT. LV Configuration: Redstone s/n CC-041/SV-9. Launch Site: Woomera . Launch Complex: LA8.
1967 Nov 29 - - 04:49 GMT. LV Configuration: Redstone s/n CC-2029/SV-10. Launch Site: Woomera . Launch Complex: LA8.

Bibliography:



Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .