Kvant 2 was the second addition to the Mir core module. The module has is divided into three pressurised compartments: instrumentation/cargo, science instruments and an airlock.

29,522 bytes. 521 x 208 pixels.


Other Designations: Dmitri. Article Number: 11F77D. Manufacturer's Designation: TsM-D 77KSD-17101. Class: Manned. Type: Space Station. Nation: Russia. Manufacturer: GNKTsKh.

Originally the modules attached to the Mir base block were to be of the NPO Energia 37KS design. Design and fabrication reached an advanced phase when it was decided that the separate tug concept resulted in too low a net scientific payload (3 tonnes). Integrating the tug with the module was expected to increase this to 5 tonnes and provide some reserve engine capability at Mir and additional pressurised volume. Accordingly the 37KS modules for Mir were cancelled in 1983. Competitive designs for integrated space station modules were submitted by KB Salyut and NPO Energia. The KB Salyut 77K modules were derived from the cancelled TKS manned ferry. The competing proposal from NPO Energia combined the 37KS module with the engine unit of Mir. In June 1984 the KB Salyut design was selected. The revised Mir program plan was to assemble the station over a three year period, and operate it for ten years (versus the original one year/five years).


Kvant-2Kvant-2

Credit: Mark Wade. 16,710 bytes. 542 x 210 pixels.


Kvant-2, which provided an airlock, additional electric power, and additional gyrodynes for orienting the station, was the first completed. It was to have been launched in March 1989, but the Kurs automatic rendezvous and docking system had suffered four failures in recent flights due to faulty microcircuits from PO Elektronika in Voronezh. Launch was delayed until October 1989 while the chips were replaced and the revised system fully tested. This caused a corresponding disruption in the Mir flight schedule. The spacecraft was finally launched on 26 November 1989 and docked on December 6 at the forward axial port of the Mir base block. It was transferred by a small manipulator arm on Mir to its permanent location at a radial port of the Mir Base Block's transfer compartment on December 8. Kvant-2 also delivered the Salyut-5B digital computer that would be used for control of the space station (this computer was originally to have been launched with Mir, then on Kvant).


Kvant 2 LargeKvant 2 Large

Credit: © Mark Wade. 2,260 bytes. 148 x 386 pixels.


Description

Kvant 2 was designed to host life science, materials science, and Earth observation experiments. It also carried a substantial amount of equipment to improve living conditions and operations of the Mir complex, including the Elektron electrolysis system to provide oxygen from recycled water, a water supply system, two water regeneration systems, sanitation facilities, a shower, and an airlock compartment

The module was divided into three pressurised compartments: instrumentation/cargo, science instrument, and airlock. The total pressurised volume was 61 cubic meters. The airlock provided EVA capability and also contained a cosmonaut manoeuvring unit that increased the range and complexity of tasks that could be accomplished during EVA. The large EVA hatch was 1 metre in diameter.

Propulsion consisted of two 3.9 kN main engines and several 400N attitude control thruster clusters used for initial docking manoeuvres (N2O4/UDMH propellants). The Kurs guidance system allowed the module to automatically rendezvous and dock with the forward port of the Mir base block. Two 26 sq. m solar arrays provided 6.9 kW. 360 A-hr of energy storage was provided by a NiCd battery system. Star sensors and six Gyrodyne momentum wheels were used to reduce propellant required for station pointing.


Kvant 2Kvant 2

Credit: © Mark Wade. 2,160 bytes. 190 x 294 pixels.


Scientific payloads included:


Specification

Total Length: 13.7 m. Maximum Diameter: 4.3 m. Total Habitable Volume: 59.00 m3. Total Mass: 19,565 kg. Total Payload: 5,000 kg. Total Propellants: 1,100 kg. Electric system: 6.90 total average kW. Electrical System: Solar cells 27.35 m span, 53.2 sq m.



37K Comparison37K Comparison

Credit: Mark Wade. 22,590 bytes. 264 x 480 pixels.


Kvant-2 Chronology


01 November 1983 37KS Modules for Mir cancelled, replaced by FGB modules.

Design and fabrication reached an advanced phase when it was decided that the separate tug concept resulted in too low a net scientific payload (3 tonnes). Integrating the tug with the module was expected to increase this to 5 tonnes and provide some reserve engine capability at Mir and additional pressurised volume. Accordingly the 37KS modules for Mir were cancelled. Work on the 37KE experimental module (Kvant) and the 37KB Buran modules continued. The function of the 37KS modules was taken up by modules by KB Salyut derived from the FGB. A competing proposal from NPO Energia for a unified spacecraft that combined the 37KS module with the engine unit of Mir was rejected.


26 November 1989 Kvant 2 Program: Mir. Launch Site: Baikonur . Launch Vehicle: Proton 8K82K. Mass: 19,565 kg. Perigee: 388 km. Apogee: 397 km. Inclination: 51.6 deg. Duration: 1,615.45 days.

Mir expansion module. Scheduled docking 2 December delayed due to failure of solar panel to extend and failure of automatic rendezvous system. Faults corrected by ground control and docked with Mir December 6, 1989 at 12:21 GMT. Transferred to lateral port December 8.
Officially: Delivery to the Mir orbital station of additional equipment and apparatus for the purpose of expanding the research and experiments conducted in the interests of science and the national economy.



Bibliography:



Back to Index
Last update 12 March 2001.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .