Family: Delta. Country: USA. Status: Hardware.

Thor IRBM with no upper stage.


Specifications

Launches: 3. Failures: 0. Success Rate: 100.00% pct. First Launch Date: 18 September 1963. Last Launch Date: 08 December 1964. Liftoff Thrust: 68,040 kgf. Total Mass: 49,340 kg. Core Diameter: 2.4 m. Total Length: 22.0 m. Development Cost $: 500.00 million. Launch Price $: 4.93 million. in 1985 price dollars. Total Development Built: 64. Total Production Built: 160. Flyaway Unit Cost $: 0.75 million. in 1958 unit dollars.


Thor Chronology


1955 Dec 1 -
1956 Aug 27 -
1957 Jan 25 - LV Configuration: Thor 101. Launch Site: Cape Canaveral . FAILURE: Lox contamination, led to a valve failure. Thrust decayed, the booster settled back throught the thrust ring, causing an oxygen fire, followed by booster explosion.
1957 Apr 19 - LV Configuration: Thor 102. Launch Site: Cape Canaveral . FAILURE: Console wiring error resulted in erroneous tracking indication; destroyed by range safety.
1957 May 21 - LV Configuration: Thor 103. Launch Site: Cape Canaveral . FAILURE: Stuck valve resulted in tank pressure buildup followed by booster explosion.
1957 Aug 1 - LV Configuration: Thor 104. Launch Site: Cape Canaveral . FAILURE: Broke up after 92 seconds.
1957 Sep 20 - LV Configuration: Thor 105. Launch Site: Cape Canaveral .
1957 Oct 3 - LV Configuration: Thor 107. Launch Site: Cape Canaveral . FAILURE: Fell back on pad, followed by explosion.
1957 Oct 11 - Launch Site: Cape Canaveral .
1957 Oct 15 - LV Configuration: Thor 108. Launch Site: Cape Canaveral . FAILURE: Turbopump gearbox failure.
1957 Oct 24 - LV Configuration: Thor 109. Launch Site: Cape Canaveral .
1957 Nov 27 -
1957 Dec 19 - LV Configuration: Thor 113. Launch Site: Cape Canaveral .
1958 Jan 1 -
1958 Jan 28 - Launch Site: Cape Canaveral .
1958 Feb 28 - LV Configuration: Thor 120. Launch Site: Cape Canaveral .
1958 Jun 4 -
1958 Nov 26 - Launch Site: Cape Canaveral .
1958 Dec 16 - Launch Site: Vandenberg .
1959 Apr 16 - LV Configuration: Thor 161. Launch Site: Vandenberg .
1959 Apr 23 - Launch Site: Cape Canaveral .
1959 Jun 16 - LV Configuration: Thor 191. FAILURE: Autopilot error.
1959 Jul 24 -
1959 Aug 3 - LV Configuration: Thor 175.
1959 Aug 14 - LV Configuration: Thor 190. FAILURE: Early fuel depletion.
1959 Sep 17 - LV Configuration: Thor 228.
1959 Oct 6 - LV Configuration: Thor 239.
1959 Oct 21 - LV Configuration: Thor 220.
1959 Nov 12 - LV Configuration: Thor 181.
1959 Dec 1 - LV Configuration: Thor 265.
1959 Dec 14 - LV Configuration: Thor 185. FAILURE: Control failure.
1960 Jan 21 - LV Configuration: Thor 215.
1960 Mar 2 - LV Configuration: Thor 272.
1960 Jun 22 - LV Configuration: Thor 233.
1960 Oct 11 - LV Configuration: Thor 186.
1960 Dec 13 - LV Configuration: Thor 267.
1961 Mar 29 - LV Configuration: Thor 243.
1961 Jun 20 - LV Configuration: Thor 276.
1961 Sep 6 - LV Configuration: Thor 165.
1961 Oct 13 -
1961 Dec 5 - LV Configuration: Thor 214.
1962 Mar 19 - LV Configuration: Thor 229. FAILURE: Destroyed at T+28 seconds.
1962 Jun 3 - Launch Site: Johnson Island .
1962 Jun 8 - Launch Site: Vandenberg .
1962 Jun 19 - LV Configuration: Thor 269.
1962 Jul 9 - Launch Site: Johnson Island . FAILURE: Engine shut down after 59 seconds. Destroyed by range safety.
1962 Jul 25 - Launch Site: Johnson Island . FAILURE: Thor exploded on liftoff.
1962 Oct 15 - Launch Site: Johnson Island .
1962 Oct 26 - Launch Site: Johnson Island . FAILURE: Failure.
1962 Nov 1 - Launch Site: Johnson Island .
1963 Sep 18 - LV Configuration: Thor 232. Launch Site: Cape Canaveral .
- 1964 February - LV Configuration: Thor LV-2D.
1964 Feb 14 - LV Configuration: Thor 299. Launch Site: Johnson Island .
1964 Mar 2 - LV Configuration: Thor 209. Launch Site: Johnson Island .
1964 Apr 21 - LV Configuration: Thor 290. Launch Site: Johnson Island .
1964 May 28 - LV Configuration: Thor 227. Launch Site: Johnson Island . FAILURE: Failure.
- 1964 June - LV Configuration: Thor LV-2D.
1964 Oct 27 - LV Configuration: Thor 260. Launch Site: Cape Canaveral .
1964 Nov 16 - LV Configuration: Thor 236. Launch Site: Johnson Island .
1964 Dec 8 - LV Configuration: Thor 247. Launch Site: Cape Canaveral .
1965 Apr 5 - LV Configuration: Thor 155. Launch Site: Johnson Island .
1965 Dec 7 - LV Configuration: Thor 188. Launch Site: Johnson Island .
1966 Jan 18 - LV Configuration: Thor 242. Launch Site: Johnson Island .
1966 Mar 12 - LV Configuration: Thor 196. Launch Site: Johnson Island .
1966 Mar 30 - Launch Site: Vandenberg .
1966 Jul 2 - LV Configuration: Thor 289. Launch Site: Johnson Island .
1967 Mar 31 - LV Configuration: Thor 168. Launch Site: Johnson Island .
1968 May 15 - LV Configuration: Thor 205. Launch Site: Johnson Island .
1968 Nov 21 - LV Configuration: Thor 252. Launch Site: Johnson Island .
1970 Mar 28 - LV Configuration: Thor 152. Launch Site: Johnson Island .
1970 Apr 25 - LV Configuration: Thor 225.
1970 Sep 24 - LV Configuration: Thor 271.
1975 Sep 18 - LV Configuration: Thor 201.
1975 Nov 5 - LV Configuration: Thor 274.

Bibliography:



Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .