This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com
 |
| PSLV - PSLV - COSPAR 1994-068 13,953 bytes. 82 x 437 pixels. |
|
Family: SLV. Country: India. Status: Hardware. Other Designations: Polar Satellite Launch Vehicle.
Indian third-generation launch vehicle, large enough to carry polar-orbiting earth resources satellites.
SpecificationsLaunches: 5. Failures: 1. Success Rate: 80.00% pct. First Launch Date: 20 September 1993. Last Launch Date: 26 May 1999. LEO Payload: 3,700 kg. to: 200 km Orbit. at: 49.5 degrees. Payload: 800 kg. to a: Geosynchronous transfer, 18 deg inclination trajectory. Liftoff Thrust: 540,000 kgf. Total Mass: 294,000 kg. Core Diameter: 2.8 m. Total Length: 44.4 m. Launch Price $: 30.00 million. in 1999 price dollars. Flyaway Unit Cost $: 17.50 million. in 1985 unit dollars.
- Stage Number: 0. 6 x PSLV-0 Gross Mass: 10,930 kg. Empty Mass: 2,010 kg. Thrust (vac): 51,251 kgf. Isp: 262 sec. Burn time: 44 sec. Isp(sl): 229 sec. Diameter: 1.0 m. Span: 1.0 m. Length: 10.0 m. Propellants: Solid No Engines: 1. SLV-1
- Stage Number: 1. 1 x PSLV-1 Gross Mass: 168,200 kg. Empty Mass: 30,200 kg. Thrust (vac): 495,590 kgf. Isp: 269 sec. Burn time: 105 sec. Isp(sl): 237 sec. Diameter: 2.8 m. Span: 2.8 m. Length: 20.3 m. Propellants: Solid No Engines: 1. PSLV-1
- Stage Number: 2. 1 x PSLV-2 Gross Mass: 45,800 kg. Empty Mass: 5,300 kg. Thrust (vac): 73,931 kgf. Isp: 293 sec. Burn time: 158 sec. Diameter: 2.8 m. Span: 2.8 m. Length: 12.5 m. Propellants: N2O4/UDMH No Engines: 1. Viking 4
- Stage Number: 3. 1 x PSLV-3 Gross Mass: 8,400 kg. Empty Mass: 1,100 kg. Thrust (vac): 33,519 kgf. Isp: 294 sec. Burn time: 83 sec. Diameter: 2.0 m. Span: 2.0 m. Length: 3.5 m. Propellants: Solid No Engines: 1. PSLV-3
- Stage Number: 4. 1 x PSLV-4 Gross Mass: 2,920 kg. Empty Mass: 920 kg. Thrust (vac): 1,428 kgf. Isp: 308 sec. Burn time: 425 sec. Isp(sl): 0 sec. Diameter: 1.3 m. Span: 2.0 m. Length: 2.6 m. Propellants: N2O4/MMH No Engines: 2. PSLV-4
PSLV Chronology
1993 Sep 20 - - 05:12 GMT. LV Configuration: PSLV s/n PSLV-D1. Launch Site: Sriharikota . FAILURE: Failure.
- IRS-1E Spacecraft: IRS. Payload: IRS-1E.
1994 Oct 15 - - 05:05 GMT. LV Configuration: PSLV s/n PSLV-D2. Launch Site: Sriharikota .
1996 Mar 21 - - 04:53 GMT. LV Configuration: PSLV s/n PSLV-D3. Launch Site: Sriharikota .
- IRS-P3 Spacecraft: IRS. Mass: 930 kg.
LEO
1997 Sep 29 - - 04:47 GMT. LV Configuration: PSLV s/n PSLV-C1. Launch Site: Sriharikota .
- IRS-1D Spacecraft: IRS. Payload: IRS-P3.
1999 May 26 - - 06:22 GMT. LV Configuration: PSLV s/n C2. Launch Site: Sriharikota . Launch Complex: PSLV.
Bibliography:- 42 - Isakowitz, Steven J,, International Reference to Space Launch Systems Second Edition, AIAA, Washington DC, 1991.
- 61 - Wilson, Andrew, editor,, Jane's/Interavia Space Directory, Jane's Information Group, Coulsdon, Surrey, 1992 et al.
- 455 - Isakowitz, Steven J,, International Reference to Space Launch Systems Third Edition, AIAA, Washington DC, 2000.
Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .