This page no longer updated from 31 October 2001. Latest version can be found at www.astronautix.com
Family: Missile. Country: USA. Status: Hardware.
Navy Special Projects Office authorized Lockheed to proceed with Polaris SLBM development, having withdrawn from the Jupiter program earlier.
SpecificationsDevelopment Cost $: 2,231.90 million. in 1961 average dollars. Total Development Built: 87. Total Production Built: 1005. Flyaway Unit Cost $: 1.46 million. in 1965 unit dollars. Cost comments: Development + flyaway costs for Polaris A-1,-2,-3.
Polaris Chronology
1956 Dec 17 -
1958 Jan 17 - Launch Site: Cape Canaveral . Launch Complex: LC29.
1961 Mar 2 - Launch Site: Cape Canaveral .
- Polaris SLBM first launch from ship.
The fourth firing of an advanced Polaris A-2, and the first from a ship, was made by the U.S.S. Observation Island as she cruised at 8 knots, 10 miles offshore from Cape Canaveral.
Bibliography:- 17 - Emme, Eugene M, Aeronautics and Astronautics: An American Chronology of Science and Technology in the Exploration of Space 1915-1960, NASA, 1961. HTML when accessed: http://www.hq.nasa.gov/office/pao/History/timeline.html
- 39 - Gunston, Bill,, Rockets and Missiles, Salamander, London, 1979.
- 281 - Nicholas, Ted G., U.S. Missile Data Book, 1983, Seventh Edition, Data Search Associates, Fountain Valley, California, 1982..
Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .