Family: Atlas. Country: USA. Status: Hardware. Department of Defence Designation: X-11.

First test model of Atlas ICBM. Two booster engines, no sustainer, dummy warhead. 50% reliability in 8 flight tests.


Specifications

Launches: 5. Failures: 2. Success Rate: 60.00% pct. First Launch Date: 25 September 1957. Last Launch Date: 03 June 1958. Liftoff Thrust: 136,080 kgf. Total Mass: 81,647 kg. Core Diameter: 3.1 m. Total Length: 28.0 m. Development Cost $: 2,230.00 million. Total Development Built: 18. Flyaway Unit Cost $: 1.80 million. in 1965 unit dollars. Cost comments: Development cost and flyaway cost total for Atlas A through F (ICBM's).


Atlas A Chronology


1950 Oct 1 -
1951 Jan 16 -
1951 Sep 1 -
1954 Mar 1 -
1954 Dec 16 -
1955 Mar 6 -
1957 Jun 11 - LV Configuration: Atlas 4A.
1957 Sep 25 - LV Configuration: Atlas 6A.
1957 Dec 17 - LV Configuration: Atlas 12A.
1958 Jan 10 - LV Configuration: Atlas 10A. Launch Site: Cape Canaveral . Launch Complex: LC12.
1958 Feb 7 - LV Configuration: Atlas 13A. Launch Site: Cape Canaveral . Launch Complex: LC14. FAILURE: Flight Control Failure.
1958 Feb 20 - LV Configuration: Atlas 11A. Launch Site: Cape Canaveral . Launch Complex: LC12. FAILURE: Flight Control Failure.
1958 Apr 5 - LV Configuration: Atlas 15A. Launch Site: Cape Canaveral .
1958 Jun 3 - LV Configuration: Atlas 16A.

Bibliography:



Back to Index
Last update 12 March 2001.
Definitions of Technical Terms.
Contact Mark Wade with any corrections or comments.
Conditions for use of drawings, pictures, or other materials from this site..
© Mark Wade, 2001 .