| astronautix.com | Solovyov |
Official NASA Biography - 1997
Call sign: Rodnik (Spring - water spring)
Final expedition to Salyut 7 station was cancelled when control was lost.
Planned flight to Salyut 7. Breakdown of Salyut 7, exhaustion of stock of Soyuz T spacecraft led to cancellation of mission.
To have docked with Mir. Cancelled all-female flight to be launched on International Woman's Day. Breakdown of Salyut 7, exhaustion of stock of Soyuz T spacecraft, and official resistance led to cancellation of the mission. Officially cancelled due to birth of Savitskaya's baby. No female cosmonauts would be in training again until a decade later.
Manned three crew. Transported to the Mir orbital space station a Soviet-Syrian crew comprising cosmonauts A S Viktorenko, A P Aleksandrov and M A Faris to conduct joint research and experiments with cosmonauts Y Romanenko and A Laveykin. Maneuvered from initial 231 X 217 km orbit to Mir's 311 X 359 km orbit. Docked with rear Mir port at 3:30 GMT 24 July. Undocked with rear port 30 July and docked to forward port. Undocked 05:55 GMT 29 December. Returned Aleksandrov, Yuri Romanenko (Soyuz TM-2), Anatoly Levchenko (Soyuz TM-4) to Earth. Recovered December 29, 1987 09:16 GMT. Landed near Arkalyk.
Transported to the Mir orbital station a Soviet/Bulgarian crew comprising cosmonauts A Y Solovyev, V P Savinykh and A P Aleksandrov (Bulgaria) to conduct joint research and experiments with cosmonauts V G Titov and M K Manarov. Interim orbit 343 x 282 km. Maneuvered to Mir's 355 x 349 km orbit. Docked 15:57 GMT 9 June to Mir's aft port. Moved to forward port 18 June. Undocked 22:55 GMT 5 September. Jettisoned Orbital Module 23:35 GMT 5 September. Planned landing 02:15 September 6 1988 failed due to confusion of infrared horizon sensors. Repeat retrofire attempt one orbit later resulted in a partial burn only. The crew had to spend a tense 24 hours in the cramped Descent Module (the Orbital Module having already been jettisoned before the retrofire burn) before making last chance deorbit. Finally Lyakhov and Afghani cosmonaut Mohmand (Soyuz TM-6) returned safely to Earth and landed September 7, 1988 00:50 GMT, 160 km SE Dzhezkazgan.
Manned two crew. Mir Expedition EO-05. Docked with Mir 8 September. Transported to the Mir orbital station a team consisting of A S Viktorenko, commander of the spacecraft, and A A Serebrov, on-board engineer, to carry out scientific and technological research and experiments. Flight cost 80 million rubles. Expected return 25 million rubles net profit.
Manned two crew. Mir Expedition EO-06. Docked with Mir. Transported to the Mir orbital station a crew comprising the cosmonauts A Y Solovyov and A N Balandin to conduct an extensive programme of geophysical and astrophysical research, experiments on biology and biotechnology and work on space materials science. Recovered August 9, 1990 07:35 GMT. Landed 70 km from Arkalyk at 50 deg 51'E 67 deg 17' N.
Repaired Soyuz TM-9 insulation rip.
Dismantled equipment. Temporarily closed damaged hatch.
Soyuz TM-13 and TM-14 crews were reshuffled extensively due to commercial seat bookings by Austria and Germany and the necessity of flying a Kazakh-born cosmonaut as part of the Baikonur rental agreement. This was the original crew assignment. The Kazakh researchers were moved to the earlier Soyuz TM-13 flight.
Mir Expedition EO-11. Joint flight with Germany. Docked at the Kvant rear port at 12:33 GMT on March 19. The Soyuz TM-14 crew, Aleksandr Viktorenko and Aleksandr Kaleri, returned to Earth together with French astronaut Michel Tognini. The Soyuz TM-14 undocked from Mir at 21:47 GMT on Aug 9, and landed in Kazakhstan at 01:07 GMT on August 10.
Mir Expedition EO-12. Russian astronauts Solovyov and Avdeev and French astronaut Tognini were inserted into an initial 190 x 200 km orbit inclined 51.6 deg. Later on July 27 they maneuvered to a 223 x 343 km orbit, and on July 28 docked with Mir in its 405 x 410 km orbit. Aleksandr Solovyov and Sergey Avdeev undocked from the Mir complex aboard Soyuz TM-15 on February 1 and landed the same day in Kazakhstan after six months in space at 03:58 GMT. Soyuz TM-15's flight was an in-orbit record for a Soyuz spaceship - 188 days 21 h 39 m.
Began installation of VDU thruster pod on Sofora tower.
Continued installation of VDU thruster pod on Sofora tower.
Completed installation of VDU thruster pod on Sofora tower.
Installed Kurs docking system antenna on Kristall module.
Mir Expedition EO-17. Docked at the Mir forward port at 00:28 on 1994 October 6. The Mir crew of Viktorenko, Kondakova and Polyakov boarded Soyuz TM-20 on January 11, and undocked from Mir's front port at 09:00 GMT. The spacecraft withdrew to about two hundred metres from Mir and then redocked in a test of the automatic Kurs system, which had failed in Progress M-24's attempted docking. Redocking came at 09:25 GMT. Soyuz TM-20 landed 22 km northeast of Arkalyk in Kazakhstan at 04:04 GMT on March 22, 1995.
Mir Expedition EO-19. Transferred Budarin, Solovyov to Mir, returned Soyuz TM-21 crew to Earth. After undocking from Mir on July 4, Atlantis spent several days on orbit, carrying out medical research work with the Spacelab-Mir module in the cargo bay. Payloads: Shuttle/Mir Mission 1, Spacelab-Mir, IMAX camera, Shuttle Amateur Radio Experiment (SAREX).
Repaired solar array. Inspected exterior of station.
Retrieved TREK detector.
Installed Miras spectrometer.
Mir Expedition EO-24. The Soyuz docked manually at 17:02 GMT August 7. Over the next six months the crew undertook seven internal and external spacewalks to repair the crippled space station. Solovyov and Vinogradov together with French astronaut Eyharts (launched aboard Soyuz TM-27) undocked from the forward port on Mir at 05:52 GMT on February 19, 1998, fired their deorbit engines at 08:16 GMT and landed in Kazakstan at 50 deg 11 N, 67 deg 31 E at 09:10 GMT.
Connected Spektr power cables. Surveyed interior of depressurised Spektr module. Retrieved equipment and belongings from module.
Inspected exterior of Spektr. Moved solar arrays.
Installed new hatch to reconnect Spektr solar array cable with Mir power bus.
Removed solar array from Kvant module.
Installed solar array.
Recovered equipment; began repairs on leaky Kvant-2 airlock. Examination of airlock indicated cause was loose belt, resulting in 10 mm gap.
Inspected station exterior.