| astronautix.com | Goodlin |
Bell flight 1. Glide flight, pilot familiarization.
Bell flight 2. Glide flight.
Bell flight 3. Glide flight, small check.
Bell flight 4. Glide flight, check of fuel-jettison system.
Bell flight 5. First XS-1 powered flight. Mach 0.79 at 10675 m. Minor engine fire. At Edwards AFB, California.
Bell flight 6. Familiarization powered flight.
Bell flight 7. Buffet boundary investigation. Mach 0.80 at 10675 m.
Bell flight 8. Buffet boundary investigation. Full-power climb. Plane reached mach 0.82.
Bell flight 9. Buffet boundary investigation. Full-power climb. Telemetry failure.
Bell flight 10. Buffet boundary investigation. Full-power climb.
Bell flight 11. Accelerated stalls. Partial power due to engine igniters. Mach 0.75.
Bell flight 12. Buffet boundary investigation. Mach 0.7.
Bell flight 13. Machmeter calibration.
Bell flight 14. Buffet boundary investigation.
Bell flight 15. Accelerated stalls.
Bell flight 16. Flight aborted after drop because of low engine-chamber pressure.
Bell flight 11. Glide flight and stall check. At Muroc Dry Lake, California.
Bell flight 12. Nosewheel damaged. First powered flight of XS-1 # 1 aircraft. At Muroc Dry Lake, California.
Bell flight 13. Handling qualities check. At Muroc Dry Lake, California.
Bell flight 14. Handling qualities check. At Muroc Dry Lake, California.
Bell flight 15. Handling qualities check. At Muroc Dry Lake, California.
Bell flight 16. Buffet-boundary investigation. Aileron-damper malfunction.
Bell flight 17. Buffet-boundary investigation. At Muroc Dry Lake, California.
Bell flight 18. Buffet-boundary investigation. At Muroc Dry Lake, California.
Bell flight 18. Airspeed calibration flight to mach 0.72. End of Bell contractor program.
Bell flight 19. Demonstration flight for Aviation Writers Association. At Muroc Dry Lake, California.