| Year - Month | United States | Soviet Union |
|
| 1952 - 06 |
- Blunt reentry vehicle concept advocated.
| |
| 1953 - 03 |
- Research on 1 million lb thrust engine begun.
| |
| 1956 - 02 |
- USAF RFP - Manned Ballistic Rocket Research System
| |
| 1956 - 06 |
| - First studies by Korolev OKB of manned spacecraft. Vostok
|
| 1957 - 01 |
| - Project Zenit (reconn satellite using R-7) begun
|
| 1957 - 12 |
| |
| 1958 - 01 |
- Eleven proposals for initial manned spacecraft
| - Work begun on Vostok spacecraft and third stage
|
| 1958 - 05 |
| - Korolev OKB cancels suborbital manned flights. Vostok
|
| 1958 - 07 |
- Saturn I initial contract.
| - Korolev letter to Politburo. Vostok
|
| 1958 - 10 |
- Project Mercury organized.
| |
| 1958 - 11 |
| - Vostok program approved. Vostok
|
| 1958 - 12 |
- Eleven proposals for Mercury received
| |
| 1959 - 01 |
- McDonnell awarded contract for Mercury project
| |
| 1959 - 03 |
| - OKB-1 preliminary work on circumlunar spacecraft
|
| 1959 - 04 |
- Seven astronauts selected for Mercury project.
| |
| 1959 - 06 |
- Saturn I launch complex construction starts.
| |
| 1959 - 09 |
- Mercury-BJ 1- test of Mercury. Success. Mercury
| |
| 1960 - 03 |
| - 20 Cosmonaut candidates report for Vostok training
|
| 1960 - 04 |
- First production Mercury capsule delivered.
| |
| 1960 - 05 |
| - Korabl-Sputnik 1 (Sputnik 4) - test of Vostok. Success. Vostok
|
| 1960 - 06 |
- Full Saturn I engine cluster full duration test.
| |
| 1960 - 07 |
- Apollo Program Announced
- Mercury-MA 1- test of Mercury. Failure. Mercury
| - Decision to begin development of N launch vehicle
- Korabl-Sputnik- test of Vostok. Failure. Vostok
|
| 1960 - 08 |
| - Korabl-Sputnik 2 (Sputnik 5)- test of Vostok. Success. Vostok
|
| 1960 - 10 |
- Apollo Initial Study Contracts
| |
| 1960 - 11 |
- Mercury-MR 1- test of Mercury. Failure. Mercury
| |
| 1960 - 12 |
- Mercury-MR 1A- test of Mercury. Success. Mercury
| - Korabl-Sputnik 3 (Sputnik 6)- test of Vostok. Success. Vostok
- Korabl-Sputnik- test of Vostok. Failure. Vostok
|
| 1961 - 01 |
- NASA Space Task Group made official.
- Mercury-MR 2- test of Mercury. Success. Mercury
| |
| 1961 - 02 |
- Beginning of Gemini
- Mercury-MA 2- test of Mercury. Success. Mercury
| |
| 1961 - 03 |
- Mercury-MR Boilerplate- test of Mercury. Success. Mercury
| - Korabl-Sputnik 4 (Sputnik 9)- test of Vostok. Success. Vostok
- Korabl-Sputnik 5 (Sputnik 10)- test of Vostok. Success. Vostok
|
| 1961 - 04 |
- Mercury-MA 3- test of Mercury. Failure. Mercury
| - Vostok 1 - first man in space, one orbit. Success. Vostok. Gagarin
|
| 1961 - 05 |
- Mercury MR-3 - first US manned suborbital flight. Success. Mercury. Shepard
- Kennedy Proclaims Moon Landing Objective
| |
| 1961 - 06 |
- Saturn I launch complex completed.
| - Moon program go-ahead in response to U.S. start
|
| 1961 - 07 |
- F-1 engine begins static testing.
- NASA-Industry Apollo Technical Conference
- Mercury MR-4 - second US suborbital flight. Success. Mercury. Grissom
| |
| 1961 - 08 |
- McDonnell proposal for Gemini
- First development contract
- Apollo Prime Contractor Bidder's Conference
- First F-1 firing.
- Merritt Island selected for Saturn V launch site.
- Chamberlain proposes lunar landing by Gemini
| - Vostok 2 - first day-long flight in space. Success. Vostok. Titov
|
| 1961 - 09 |
- Purchase of land for Saturn V launch facilities.
- Selection of Saturn first stage assembly plant
- North American selected to build S-II stage.
- Mercury 4 - Mercury orbital test. Success. Mercury
- Selection of Houston for control center.
| |
| 1961 - 10 |
- Bids received for Apollo prime contractor
- Saturn I first flight.. Success. (R&D)
| |
| 1961 - 11 |
- Mercury Scout-1. Failure. Radio Test Spacecraft
- Second decision on launch vehicles
- Contract issued for build of 20 Saturn I's.
- North American awarded prime contract
- Mercury 5 - Mercury orbital test. Success. Mercury
| |
| 1961 - 12 |
- McDonnell given letter contract for Gemini
- Selection of Saturn C-5 as Launch Vehicle
| |
| 1962 - 01 |
| - Development of RD-270 engine begun
- Vostok ZH studies
|
| 1962 - 02 |
- Mercury 6 - first manned orbital flight. Success. Mercury. Glenn
| |
| 1962 - 04 |
| - First Soviet announcement of manned lunar goals
|
| 1962 - 05 |
- Mercury 7 - overshot landing zone. Success. Mercury. Carpenter
| |
| 1962 - 07 |
- Selection of LOR as Mission Mode
| |
| 1962 - 08 |
| - Vostok 3 - joint flight with Vostok 4. Success. Vostok. Nikolayev
- Vostok 4 - joint flight with Vostok 3. Success. Vostok. Popovich
|
| 1962 - 09 |
| - N launch vehicle upgraded to 75 tonne payload
|
| 1962 - 10 |
- Mercury 8 - textbook flight. Success. Mercury. Schirra
| |
| 1962 - 11 |
- Grumman selected to build LM
| |
| 1963 - 02 |
| - Soyuz 'leaves drafting boards'
|
| 1963 - 03 |
| - Korolev approves draft plan for 'Soyuz Complex'
|
| 1963 - 05 |
- Mercury 9 - first US one-day flight. Success. Mercury. Cooper
| |
| 1963 - 06 |
| - Vostok 5 - joint flight with Vostok 6. Success. Vostok. Bykovsky
- Vostok 6 - first woman in space. Success. Vostok. Tereshkova
|
| 1963 - 09 |
| - Construction of N-1 launch complex begins
|
| 1963 - 10 |
| - Gagarin identified as head of lunar cosmonauts
|
| 1964 - 01 |
- Saturn 5 - Saturn I flight test. Success. Jupiter nose cone
| |
| 1964 - 04 |
- Gemini 1- first Gemini test flight. Success. Gemini
- FIRE 1- Apollo reentry shape test. Success. FIRE
| |
| 1964 - 05 |
- Saturn 6- Saturn I flight test. Success. Apollo CSM
| |
| 1964 - 08 |
| - Full lunar program go-ahead
|
| 1964 - 09 |
- Saturn 7- Saturn I flight test. Success. Apollo CSM
| |
| 1964 - 10 |
| - UR-700 project cancelled
- Cosmos 47 - test flight for Voskhod 1. Success. Voskhod
- Voskhod 1 - first three-man flight. Success. Voskhod. Feoktistov, Komarov, Yegorov
- Khrushchev removed from power. Lunar
|
| 1965 - 01 |
- Gemini 2 - second test of Gemini. Success. Gemini
| |
| 1965 - 02 |
- Pegasus 1 - Saturn I flight test. Success. Apollo CSM
| - Cosmos 57 - test flight for Voskhod 2. Success. Voskhod
|
| 1965 - 03 |
- Gemini 3 - first manned Gemini flight. Success. Gemini. Grissom, Young
| - Babakin takes over Lavochkin OKB
- Voskhod 2 - first space walk. Success. Voskhod. Belyayev, Leonov
|
| 1965 - 04 |
- First ground test firing of S-II stage
| |
| 1965 - 05 |
- FIRE 2 - Apollo reentry shape test. Success. FIRE
- Pegasus 2 - Saturn I flight test. Success. Apollo CSM
| |
| 1965 - 06 |
- Gemini 4 - first US space walk. Success. Gemini. McDivitt, White
| |
| 1965 - 07 |
- Pegasus 3 - Saturn I flight test. Success. Apollo CSM
| - Proton 1 - test of circumlunar booster. Success. Proton
|
| 1965 - 08 |
- First ground test firing of S-IVB stage
- First ground test firing of S-IC stage
- Gemini 5 - long duration flight. Success. Gemini. Cooper, Conrad
| |
| 1965 - 10 |
- First Flight CSM Shipped from Factory
- GATV 6. Failure. Gemini Agena Target Vehicle
| - Cosmonauts write letter to Brezhnev
|
| 1965 - 11 |
| - Proton 2 - test of circumlunar booster. Success. Proton
|
| 1965 - 12 |
- Gemini 7 - long endurance flight. Success. Gemini. Borman, Lovell
- Gemini 6 - first rendezvous in space with Gem.7. Success. Gemini. Schirra, Stafford
| - Chelomei circumlunar project given to Korolev
|
| 1966 - 01 |
| - Korolev dies in in Moscow
|
| 1966 - 02 |
- Apollo 201 (CM 009) - test of lunar orbiter craft. Success. Apollo CSM
| - Cosmos 110 - high altitude dog flight. Success. Voskhod 3KV
|
| 1966 - 03 |
- Gemini 8. Success. Gemini. Armstrong, Scott
- Gemini 8 Agena Target. Success. Gemini Agena Target Vehicle
| |
| 1966 - 04 |
| - Cosmonaut training for lunar flights announced
|
| 1966 - 05 |
- GATV 9. Failure. Gemini Agena Target Vehicle
- First Saturn V vehicle rolled out to pad
| |
| 1966 - 06 |
- Gemini 9 ATDA. Success. Agena Target Docking Adapter
- Gemini 9. Success. Gemini. Stafford, Cernan
| - Voskhod 3 - Planned flight date (cancelled). Voskhod. Shonin,Volynov
|
| 1966 - 07 |
- Apollo 2. Success. Apollo CSM
- Gemini 10 Agena Target. Success. Gemini Agena Target Vehicle
- Gemini 10. Success. Gemini. Young, Collins
| - Proton 3 - test of circumlunar booster. Success. Proton
- Komarov announces that USSR will beat US to moon
|
| 1966 - 08 |
- Apollo 202 (CM 011) - test of lunar orbiter craft. Success. Apollo CSM
| |
| 1966 - 09 |
- Gemini 11 Agena Target. Success. Gemini Agena Target Vehicle
- Gemini 11. Success. Gemini. Conrad, Gordon
| |
| 1966 - 11 |
- Gemini 12 Agena Target. Success. Gemini Agena Target Vehicle
- Gemini 12. Success. Gemini. Lovell, Aldrin
| - Lunar coordination problems
- Government go-ahead for N-1 use in lunar program
- Chelomei presents direct flight to moon concept
- Cosmos 133 - test of Soyuz earth orbit craft. Success. Soyuz 7K-OK
|
| 1966 - 12 |
| - Soyuz l - test of Soyuz earth orbit craft. Failure. Soyuz 7K-OK
|
| 1967 - 01 |
| - Lunar circumlunar flight cosmonauts assigned. Lunar
- First L-1 Zond spacecraft mated to Proton. Soyuz 7K-L1
|
| 1967 - 02 |
- Apollo 204 - Apollo Fire - Apollo redesigned. Failure. Apollo CSM. Grissom, White, Chaffee
| - Government approves landing on moon by end 1968
- Cosmos 140 - test of Soyuz earth orbit craft. Success. Soyuz 7K-OK
|
| 1967 - 03 |
| - Cosmos 146 - test of circumlunar craft. Success. Soyuz 7K-L1
- CIA reports on Soviet space developments
|
| 1967 - 04 |
| - Cosmos 154 - test of circumlunar craft. Success. Soyuz 7K-L1
- Soyuz 1 - Crashed, killed Komarov - Soyuz Redesign. Failure. Soyuz 7K-OK. Komarov
- Soyuz 2A - Planned flight date. Soyuz 7K-OK. Bykovsky,Khrunov,Yeliseyev
|
| 1967 - 08 |
| - Tass announces water landing exercises
|
| 1967 - 09 |
| - Zond (4a) - test of circumlunar craft. Failure. Soyuz 7K-L1
|
| 1967 - 10 |
| - Cosmos 186 - successful test of automated docking. Success. Soyuz 7K-OK
- Cosmos 188 - docked with Cosmos 186. Success. Soyuz 7K-OK
|
| 1967 - 11 |
- Apollo 4 - second test of lunar booster. Success. Apollo CSM
| - Zond (4b) - test of circumlunar craft. Failure. Soyuz 7K-L1
|
| 1968 - 01 |
- Apollo 5 - first test of LM lunar lander. Success. Apollo LM
| - 20 cosmonauts begin training for lunar landing
|
| 1968 - 03 |
| - Originally planned N-1 first launch
- Zond 4 - test of circumlunar craft. Success. Soyuz 7K-L1
- Final moon landing plan approved by Soviet state
- Cosmonaut Gagarin dies in plane crash
|
| 1968 - 04 |
- Apollo 6. Success. Apollo LM
| - Cosmos 212 - successful test of automated docking. Success. Soyuz 7K-OK
- Cosmos 213 - docked with Cosmos 213. Success. Soyuz 7K-OK
- Zond (5a) - test of circumlunar craft. Failure. Soyuz 7K-L1
|
| 1968 - 06 |
| - November manned circumlunar flight set. Lunar
|
| 1968 - 07 |
| - DIA/CIA warn of impending Zond circumlunar flight
- Zond 7K-L1#8- test of circumlunar craft. Failure. Soyuz 7K-L1
|
| 1968 - 08 |
| - Cosmos 238 - unmanned test of redesigned Soyuz. Success. Soyuz 7K-OK
|
| 1968 - 09 |
| - Zond 5 - test of circumlunar craft. Success. Soyuz 7K-L1
|
| 1968 - 10 |
- Apollo 7 - manned test of redesigned Apollo. Success. Apollo CSM. Schirra, Eisele, Cunningham
| - Soyuz 2 - docking target for Soyuz 3. Success. Soyuz 7K-OK
- Soyuz 3 - manned test of redesigned Soyuz. Success. Soyuz 7K-OK. Beregovoi
|
| 1968 - 11 |
| - Zond 6 - test of circumlunar craft. Success. Soyuz 7K-L1
- Proton 4 - first test of earth orbit version. Success. Proton
|
| 1968 - 12 |
- Apollo 8 - FIRST MANNED LUNAR FLIGHT. Success. Apollo CSM. Borman, Lovell, Anders
| - 18 cosmonauts in lunar training
|
| 1969 - 01 |
| - Soyuz 4 - first docking and crew transfer. Success. Soyuz 7K-OK. Shatalov
- Soyuz 5 - docked with Soyuz 5. Success. Soyuz 7K-OK. Khrunov, Volynov, Yeliseyev
|
| 1969 - 02 |
| - N-1 - first attempt to launch lunar booster. Failure. Soyuz 7K-L1
|
| 1969 - 03 |
- Apollo 9 CSM/LM earth orbit test. Success. Apollo CSM. McDivitt, Scott, Schweickart
| |
| 1969 - 05 |
- Apollo 10 CSM/LM lunar orbit test. Success. Apollo CSM. Stafford, Young, Cernan
| |
| 1969 - 06 |
| - Original planned date for first LK test. LK-T2K
|
| 1969 - 07 |
- Apollo 11 FIRST LANDING ON MOON. Success. Apollo CSM. Armstrong, Collins, Aldrin
| - N-1 - second attempt to launch lunar booster. Failure. Soyuz 7K-L1
|
| 1969 - 08 |
| - Zond 7 Circumlunar flight. Success. Soyuz 7K-L1
|
| 1969 - 11 |
- Apollo 12 Second Moon landing. Success. Apollo CSM. Conrad, Gordon, Bean
| |
| 1970 - 04 |
- Apollo 13 Emergency return. Success. Apollo CSM. Lovell, Swigert, Haise
| |
| 1970 - 10 |
| - Zond 8 Circumlunar flight. Success. Soyuz 7K-L1
- Zond - further circumlunar flights cancelled. Soyuz 7K-L1
|
| 1970 - 11 |
| - Cosmos 379 - first test of LK lunar lander. Success. LK-T2K
|
| 1970 - 12 |
| - Cosmos 382 - first test of LOK lunar orbiter. Success. Soyuz 7K-LOK
- UR 700/LK-1 definitively cancelled
|
| 1971 - 01 |
- Apollo 14 Third lunar landing. Success. Apollo CSM. Shepard, Roosa, Mitchell
| |
| 1971 - 02 |
| - Cosmos 398 - second test of LK lunar lander. Success. LK-T2K
|
| 1971 - 06 |
| - N-1 - third attempt to launch lunar booster. Failure. Soyuz 7K-L1
|
| 1971 - 07 |
- Apollo 15 Fourth lunar landing. Success. Apollo CSM. Scott, Worden, Irwin
| |
| 1971 - 08 |
| - Cosmos 434 - third test of LK lunar lander. Success. LK-T2K
|
| 1972 - 04 |
- Apollo 16 - Fifth lunar landing. Success. Apollo CSM. Young, Mattingly, Duke
| |
| 1972 - 11 |
| - N-1 - Fourth attempt to launch lunar booster. Failure. Soyuz 7K-LOK
|
| 1972 - 12 |
- Apollo 17 - Fifth and last lunar landing. Success. Apollo CSM. Cernan, Evans, Schmitt
| |
| 1974 - 01 |
| - Glushko takes control of lunar program from Mishin
|
| 1974 - 02 |
| - Manned lunar program, N-1 booster cancelled
|